Lines
For transmission line projects, we offer specialized services that cover every stage of development to
ensure efficient and reliable power evacuation. Our work starts with pre-feasibility and feasibility studies, including route optimization, topographical surveys, and environmental and social impact assessments to identify the most sustainable and cost-effective corridors. We then deliver robust detailed engineering designs for towers, foundations, and line configurations, followed by the preparation of comprehensive tender documents. Throughout the construction phase, we provide vigilant construction supervision and project management, ensuring that all work meets stringent safety and quality standards. Our services also extend to crucial aspects like land acquisition and compensation planning, and continuous technical, environmental, and social monitoring to guarantee compliance and successful project delivery.
Explore Projects
-
Sasec (South Asia Subregional Economic Cooperation) Power System Expansion Project
-
Tamakoshi (Khimti)-Kathmandu
-
Consulting Services For The Supervision Of Nepal Distribution(dsuep-eib)
-
Chilime-Trishuli
-
Hetauda-Dhalkebar-Duhabi
-
Damauli-Kushma-Bafikot
-
Budhigandaki Corridor
-
Tingla-New Khimti-Sunkoshi-Dhalkebar
-
Karmadev (Indo-Nepal Border)-Phukot (Kalikot)
-
Consulting Services For Detailed Survey And Updated Line Design
-
Assam Intra State Transmission System Enhancement Project
-
Power Transmission & Distribution Efficiency Enhancement Project (Ptdeep)
Explore Projects
-
Sasec (South Asia Subregional Economic Cooperation) Power System Expansion Project
-
Tamakoshi (Khimti)-Kathmandu
-
Consulting Services For The Supervision Of Nepal Distribution(dsuep-eib)
-
Chilime-Trishuli
-
Hetauda-Dhalkebar-Duhabi
-
Damauli-Kushma-Bafikot
-
Budhigandaki Corridor
-
Tingla-New Khimti-Sunkoshi-Dhalkebar
-
Karmadev (Indo-Nepal Border)-Phukot (Kalikot)
-
Consulting Services For Detailed Survey And Updated Line Design
-
Assam Intra State Transmission System Enhancement Project
-
Power Transmission & Distribution Efficiency Enhancement Project (Ptdeep)
Project List
-
SASEC (South Asia Sub Regional Economic Cooperation) Power System Expansion Project-Project Supervision Consultant (PSC) (Phase-II)
TL-6/ TL-7/TL-8 220 kV Kaligandaki Corridor TL Project
TL-9/TL-10 220 kV Marsyangdi Corridor TL project
TL-11 220 kV Marsyangdi – Kathmandu TL Project
TL-19 132 kV Samudratar Trishuli 3B Hub TL Project
TL-39 Distribution System Expansion in Eastern, Central, Western Nepal Grid Substation Reinforcement Sub Project -
TL-20 Consulting Services for Project Supervision Consultant (Phase II) – Electricity Transmission Expansion & Supply Improvement Project for 400 kV Tamakoshi (Khimti) Kathmandu Transmission Line and associated Substations
-
Tl-30 Tingla Hub – Likhu Hub – New Khimti – Sunkoshi Hub – Dhalkebar 400 kV Transmission Line and Associated Substations
-
TL-31 Budhigandaki Corridor (Philim-Gumda-Ratamate) 400 kV Transmission Line and 132 kV Dailekh-Kalikot-Jumla and Lamoshangu-Kavre/Ramechhap Transmission Line and Associated Substations
-
TL-34 Damauli – Kusma – Burtibang – Bafikot 400 kV Transmission Line and Associated Substations
-
TL-35 Chilime – Trishuli 220 kV Transmission Line Project
-
TL-43 132 kV S/C Transmission Line of Super Lower Bagmati Hydropower Project
-
TL-44 220 kV D/C Transmission Line of Manang Marsyangdi Hydroelectric Project
-
TL-51 Power Transmission and Distribution Efficiency Enhancement Project (PTDEEP)
-
TL-52 Project supervision consulting services for the supervision of contracts under Nepal distribution system upgrade and expansion project (DSUEP-EIB)
-
Client – Asian Development Bank (Implementing Agency-NEA)
Works – Design Review and Construction Supervision of Transmission Line & Substation.
-
Client – NEA
Funding Agency: ADB
Works – Design review, quality monitoring, and construction supervision
-
Client – Nepal Electricity Authority (Funded by ADB)
Works – Engineering and Environmental Study
-
Client – Nepal Electricity Authority (Funded by ADB)
Works – Engineering and Environmental Study
-
TL-34 Damauli – Kusma – Burtibang – Bafikot 400 kV Transmission Line and Associated Substations
Works – Engineering and Environmental Study
-
Client – Nepal Electricity Authority (NEA), Nepal, funded by KfW, Germany
Works – Survey, Geotechnical Investigation, Preparation of technical specifications and bidding documents, Support in bidding process, Supervision during construction, testing and commissioning
-
Client – Super Bagmati Hydropower Pvt. Ltd.
Works – Walkover survey, Detailed survey, Tower Spotting, Surface Geological Mapping, Bill of Quantity (BoQ), Technical Specification and Tender Document Preparation
-
Client – Q.Y.E.C Construction Pvt. Ltd
Works – Feasibility study and design of 220 kV Double Circuit Transmission Line and IEE/EIA study of Transmission Line.
-
Client – Nepal Electricity Authority
Funded by ADB
Works – Bidding Document Preparation, Project Management & Construction Supervision of distribution networks and underground cabling works.
-
TL-52 Project supervision consulting services for the supervision of contracts under Nepal distribution system upgrade and expansion project (DSUEP-EIB)
Works – Design Review and Construction supervision in Lumbini and Sudurpaschhim province of Nepal and quality monitoring and implementation of environmental and social safeguards
-
TL-1 Hetauda – Dhalkebar – Duhabi 400 kV Transmission Line Project
-
TL-17 Makarigad Gaun – Balanch 33 kV Transmission Line Project in Darchula district, Nepal.
-
TL-2 220 kV Double Circuit Transmission line from Isuwa Khola PRoR Cascade Hydro Electric Project to 220 kV/132 kV Shitalpati Substation (IKHEP)
-
TL-18 Consulting Services for Detailed Survey and Updated Line Design for 30 km of Changes in 400 kV Transmission Line Route Alignment.
-
TL-3 Resettlement and Rehabilitation (R & R) Plan preparation of 400 kV Double Circuit Transmission Line (length – 210 km)
-
TL-18 Consultant/Engineer for Design Review and Construction Supervision of Electricity Distribution System- Extension and Upgradation Procurement Ref. Number: MCA-N/ETP/QCBS/012
-
TL-3 Arun-3 HPP-33 kV TL Project
-
TL-20 Consulting Services for Project Supervision Consultant (Phase II) – Electricity Transmission Expansion & Supply Improvement Project for TL 400 kV Tamakoshi (Khimti) – Kathmandu Transmission Line and associated Substations.
-
TL-4 132 kV Single Circuit Transmission Line from Luja Khola Hydro Electric Project to 132 kV /33 kV Tingla (LJKHEP)
-
TL-20 Tamakoshi (Khimti) – Kathmandu 220 kV/400 kV Transmission Line Project (Khimti-Barhabise 220 kV TL 44 and Barhabise – Kathmandu 400/220 kV TL -60 and associated substations
-
TL-5 132 kV Transmission Line of Langtang Khola Hydroelectric Project (20 MW), Rasuwa District
-
TL-21 Upper Trishuli-I HEP 220 kV Transmission Line Project
-
SASEC (South Asia Sub regional Economic Cooperation) Power System Expansion Project-PPS
TL-6/ TL-7/TL-8 220 kV Kaligandaki Corridor TL Project
TL-9/ TL-10 220 kV Marsyangdi Corridor TL project
TL-11 220 kV Marsyangdi – Kathmandu TL Project -
TL-22 Khimti Dhalkebar 220 kV Transmission Line Project
-
TL-15 Karmadev – Phukot 400 kV Double Circuit Karnali Corridor Transmission Line Project
-
TL-23 Lower Arun – Dhalkebar 400 kV Transmission Line Project
-
TL-28 Study for Environmental and Social Considerations for “The Project for Construction of Transmission and Distribution Network Development in Nepal”
-
TL- 40 SASEC (South Asia Sub regional Economic Cooperation) Power System Expansion Project-PSC
TL-6/ TL-7/ TL-8 220 kV Kaligandaki Corridor TL Project
TL-9/ TL-10 220 kV Marsyangdi Corridor TL project
TL-11 220 kV Marsyangdi – Kathmandu TL Project
TL-19 132 kV Samudratar Trishuli 3B Hub TL Project
Distribution System Expansion in Eastern, Central, Western Nepal -
TL-57 Reconstruction and Improvement of Electricity in Earthquake affected Districts of Rasuwa & Nuwakot.
-
TL-29 Assessment for Private Sector Involvement in Power Transmission in The Asia Pacific Region
-
Client – Mega Dang Valley Irrigation Project
Works – Feasibility Study, IEE & Detailed Design of 5 Dams :
D-1 Dam at Vitri Khola – 29 m (Earthen Dam)
D-2 Dam at Gwar Khola – 125 m (Clay Core Rockfill Dam)
D-3 Dam at Balim Khola – 70 m (Clay Core Rockfill Dam)
D-4 Dam at Vutiya Tal/ Tuhi Khola – 15 m (Earthen Dam)
D-5 Dam at Ranighat Khola – 43 m (Earthen Dam) -
Client – Nepal Water and Energy Development Company Pvt. Ltd.
Works – Assistance in Preperation of Detailed Design, Drawings & Cost Estimates
-
Client – Nepal Water and Energy Development Company Pvt. Ltd
Works – Project investigation, Design and Detailed Feasibility Study. Preparation of EIA, ToR Scoping and EIA report, Survey, Design and Drawing preparation of access road
-
Client – Marsyangdi Power Company P. Ltd.
Works – Design review, Cost review, financial analysis, preparation of construction schedule, Power and Energy calculation for Peaking RoR, Power Evacuation Study, facilitation of Grid Connection Agreement and Power Purchase Agreement
-
Client – Machhapuchhre Bank Limited
Works – Prepare Due Diligence Study Report, review and independent analysis of hydrology and geological study, review and independent assessment of installed capacity and energy generation, review and independent analysis of transmission plan, review of design parameters and criteria, verification of cost estimates, financial analysis
-
Client – Ampik Energy Pvt. Ltd.
Works – Geotechnical investigation that includes 265 m of core drilling and associated laboratory tests.
-
Client – Budhigandaki Hydropower Development Committee
Works – Feasibility study, Detailed Design Report & Tender documents preparation and EIA Studies
-
Client – Dudh Koshi Power Company Pvt. Ltd.
Works – Detailed Engineering Design & Tender Documents Preparation
-
Client – VA TECH Hydro, Switzerland
Works – Investigation, Detailed Feasibility Study of the project, which includes Topographical survey, Geological mapping & investigation, Hydrological analysis EIA study etc.
-
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation, Design and Detailed Feasibility Study.
-
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation of optimal plant capacity. Detail analysis of the project alternatives. Preparation of optimization study report.
-
Client – Bras Power International, Brazil
Works – Hydrological gauging station establishment, Land Acquisition, Survey, Design and Drawing preparation for approximately 26 km long access road
-
Client – GITEC Nepal Pvt. Ltd
Works – Upgrading and Detailed Feasibility Report and ACRP Report.
-
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – H20 Hydropower
Works – Inventory study & Preparation of Desk Study report
-
Client – GCE Group Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – Tila Hydropower
Works – Inventory study & Preparation of Desk Study report
-
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – PES Engineers Pvt. Ltd.
Works – Preparation of Desk Study report
-
Client – Upper Seti Hydropower Pvt. Ltd.
Works – Feasibility Study including Field Investigation (Hydrological & Sedimentological Study, Geological Mapping, Topographical Survey)
-
Client – Energy Venture Pvt. Ltd.
Works – Review of Feasibility Study & Detail Project Report. Detail Engineering Design with reinforcement drawing. Preparation of Tender Documents
-
Client – Jhaymolonga Hydropower Company P. Ltd
Works – Detail design of all project structures including 3.5 km HRT, preparation of tender documents, survey and design of access road and transmission line, hydrological and sedimentological studies, geological mapping.
-
Client – Gezhouba Group Power Investment Nepal Pvt. Ltd.
Works – Review of Feasibility Study
-
Client – Department of Electricity Development
Works – Feasibility Study and IEE Study
-
Client – Tamakoshi Jalvidyut Company Limited
Funded by Asian Infrastructure Investment Bank
Works – Restructure Environmental Management Action Plan (EMAP), prepare Stakeholder Engagement Plan, prepare Monitoring Plan, conduct Cumulative Impacts Assessment, Climate Change Assessment, develop Pollution control strategy, develop Public Health and Safety Strategy, develop Local employment strategy, prepare Land acquisition and Livelihood Restoration Plan, Environmental Flows and Ecosystem Services Assessment, develop E&S actions to be implemented by the Developer, develop E&S specifications for the EPC contractor. Preparation of Supplemental Environmental and Social Documentation (SESD)
-
Client – Tamakoshi Jalvidyut Company Limited
Funding Agency – Asian Infrastructure Investment Bank
Works – To conduct and prepare Critical Habitat Assessment, Consultation and Partnership Building Strategy, Mitigation Strategies and Biodiversity Action Plan (BAP) -
Client – Consortium led by Laxmi Bank
Works – Due Diligence Study for Cost Overrun
-
Client – Woonsun Energy & Construction Co. Ltd., Seoul, Korea
Works – Feasibility study
-
Client – Bank of Kathmandu
Works – Due Diligence Study.
-
Client – Himalayan Bank Ltd.
Works – Technical Bill Verification and Progress monitoring
-
Client – Surya Energy
Works – Detail Feasibility including field investigation (hydrological and sedimentological study, geological mapping, topographical survey) & EIA
-
Client – Kabeli HP Dev. Co. P Ltd
Works – Detail Design of all project structures such as headworks, headrace tunnel, penstock, powerhouse, camp facilities, access road including hydrological & sedimentological studies and geological mapping.
-
Client – Consortium led by Siddhartha Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Everest Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Chujung Khola Hydropower Co. Ltd.
Works – Detail Feasibility Study including field investigation (Hydrological and sedimentological study, Geological mapping, Topographical survey)
-
Client – Urja Developers Pvt. Ltd
Works – Social Assessment and Biodiversity Assessment
-
Client – Department of Electricity Development
Works – Feasibility and Environmental Impact Assessment (EIA) study
-
Client – Laxmi Sunrise Bank Limited
Works – Due Diligence Study
-
Client – Nepal Infrastructure Bank Limited
Works – Due Diligence Study
-
Client – Himalayan Bank Limited
Works – Due Diligence Study
-
Client – Nabil Bank Limited
Developer – Sanima Jum Hydropower Limited
Works – Due Diligence Study of the Jum Khola -
Client – IFC
Works – Due Diligence study, a high-level technical appraisal of the 3 hydro projects
-
Client – Laxmi Bank Ltd.
Works – Due Diligence Work
-
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
Client – Citizen Bank International Ltd.
Works – Due Diligence Study
-
Client – Balephi Energy Pvt. Ltd.
Works – Due Dilligence Study
-
Client – Kumari Bank Ltd.
Works – Due Delligence Study
-
Client – Tamor Energy Pvt. Ltd.
Works – Technical document review of underground works
-
Client – Maa Durga Kali Hydropower Company Pvt. Ltd.
Works – Detailed Project Report (DPR)
-
Client – T-3 Hydro Company Pvt. Ltd.
Works – Pre-feasibility Study
-
TL-42 Assam Intra State Transmission System Enhancement Project
-
Client – Assam Electricity Grid Corporation Limited (AEGCL), India
Works – Consultancy Services for Project Implementation and Management Support, Design Review and Construction supervision of 1113 circuit km of 400 kV, 220 kV and 132 kV Transmission line, and 400/220 kV, 220/132/33 kV, 220/132 kV, 132/33 kV & 132/11 kV Substation with additional capacity of 5606 MVA.
Project List
-
Client – Nepal Electricity Authority (NEA) (World Bank Fund)
Scope – Construction Supervision and Substation Design.
-
Client – Hydro Vision Pvt. Ltd.
Works – Feasibility Study of 27 km, 33 kV Transmission Line including Topographic survey, Cost Estimation, Geographical and Geological Survey, Design and Project Component Optimization.
-
Client – Isuwa Energy Pvt. Ltd.
Works – Preparation of Feasibility Study & Tender Documents, Desk Study of Interconnection Point, Tower Spotting and Tower Optimization in PLS-CADD, Check Survey and Preparation of Tender Documents
-
Client – Millennium Challenge Account Nepal (MCA-Nepal)
Works – Inception of the assignment, Detailed Field survey and preliminary engineering design, Geo-technical Investigation, Detailed Environmental and Social Assessment, Pegging activities and Preparation of final survey report.
-
Client – SJVN Arun-3 HPP Power Development Company (SAPDC)
Works – Cadastral Map Verification, Social and Environmental Survey, Preparation of Resettlement and Rehabilitation plan, Supplementary IEE , Detailed Survey & Design of Changed Portion of the 400 kV Transmission Line.
-
Client – Mellenium Challenge Account-Nepal (MCA-NEPAL)
Funding Agency – MCC-United States of America
Works – Consultant/Engineer for Design Review and Construction Supervision
-
Client – SJVN Arun-3 Power Development Company P. Ltd.
Works – Survey & Investigation for Proposed 33 kV Transmission Line Preparation of IEE Report
-
Client – NEA | Funding Agency – ADB
Works – Design review, quality monitoring, and construction supervision
-
Client – Silk Power Pvt. Ltd.
Works – Tower Spotting & Tower Optimization in PLS-CADD, Check Survey, Preparation of Technical Specifications & Tender Documents
-
TL-20 Tamakoshi (Khimti) – Kathmandu 220 kV/400 kV Transmission Line Project (Khimti-Barhabise 220 kV TL 44 and Barhabise – Kathmandu 400/220 kV TL -60 and associated substations
Funding Agency – (World Bank Fund)
Works – Preparation of technical specifications and bidding documents, Support in bidding process, Supervision during construction, testing and commissioning, quality monitoring an construction supervision
-
Client – Multi Energy Development Pvt. Ltd.
Works – Feasibility study and design of about 4.5 km, Single circuit 132 kV transmission line
-
Client – Nepal Water and Energy Development Co. Pvt. Ltd (NWEDC)
Works – Detail TL Survey and Design, and IEE Study
-
Client – Asian Development Bank (Implementing Agency-NEA)
Works – Assistance to NEA in preparing designs, technical specifications and bidding documents. Assistance to NEA in the bidding process and bid evaluation including preparation of technical and financial evaluation reports. Assistance to NEA in contract negotiation with the contractor until contract awarded and advance payment paid.
-
Client – Nepal Electricity Authority (NEA) (World Bank Fund)
Works – Consultancy for planning design, preparation of bidding document with detail specification, bid evaluation and contact negotiation, design review, quality assurance, construction supervision, contract management and knowledge transfer etc. (In association with Power Grid INDIA)
-
Client – Rastriya Prasaran Grid Company Limited
Works – Detailed Engineering Design and Enviornmental Study of Transmission Line and Substations. Preparation of Technical Specifications and Tender Documents. Karmadev (Indo-Nepal Border – Phukot (Kalikot) is a 130 km double circuit line project, which also includes two 400 kV GIS substations at Phukot and Betan.
-
Client – Lower Arun Hydroelectric Co. P. Ltd
Works – Desk Study
-
Client – NEWJEC Inc, Japan (Funded by JICA)
Works – Environmental and social assessment for the construction of 132 kV/ 11 kV Birauta S/S including underground transmission line, preparation of IEE report including RAP.
-
Client – Asian Development Bank (Implementing Agency-NEA)
Works – Grid Substation Reinforcement Sub Project, Construction Supervision of Transmission Line & Substation
-
Client – Nepal Electricity Authority (Funded by KfW and EIB)
Works – Engineering Design, Bidding Document Preparation, Environmental and Social Studies & Construction Supervision
-
Client – IFC
Works – Identify specific domestic and cross-border transmission projects that could be considered for possible private sector investment, and prepare and propose amendments to already available tools, documents, and templates for supporting the structuring of these projects.
-
Client – Asian Development Bank (Implementing Agency-NEA)
Works – Design Review and Construction Supervision of Transmission Line & Substation.
-
Client – NEA
Funding Agency: ADB
Works – Design review, quality monitoring, and construction supervision
-
Client – Nepal Electricity Authority (Funded by ADB)
Works – Engineering and Environmental Study
-
Client – Nepal Electricity Authority (Funded by ADB)
Works – Engineering and Environmental Study
-
TL-34 Damauli – Kusma – Burtibang – Bafikot 400 kV Transmission Line and Associated Substations
Works – Engineering and Environmental Study
-
Client – Nepal Electricity Authority (NEA), Nepal, funded by KfW, Germany
Works – Survey, Geotechnical Investigation, Preparation of technical specifications and bidding documents, Support in bidding process, Supervision during construction, testing and commissioning
-
Client – Super Bagmati Hydropower Pvt. Ltd.
Works – Walkover survey, Detailed survey, Tower Spotting, Surface Geological Mapping, Bill of Quantity (BoQ), Technical Specification and Tender Document Preparation
-
Client – Q.Y.E.C Construction Pvt. Ltd
Works – Feasibility study and design of 220 kV Double Circuit Transmission Line and IEE/EIA study of Transmission Line.
-
Client – Nepal Electricity Authority
Funded by ADB
Works – Bidding Document Preparation, Project Management & Construction Supervision of distribution networks and underground cabling works.
-
TL-52 Project supervision consulting services for the supervision of contracts under Nepal distribution system upgrade and expansion project (DSUEP-EIB)
Works – Design Review and Construction supervision in Lumbini and Sudurpaschhim province of Nepal and quality monitoring and implementation of environmental and social safeguards
-
Client – Assam Electricity Grid Corporation Limited (AEGCL), India
Works – Consultancy Services for Project Implementation and Management Support, Design Review and Construction supervision of 1113 circuit km of 400 kV, 220 kV and 132 kV Transmission line, and 400/220 kV, 220/132/33 kV, 220/132 kV, 132/33 kV & 132/11 kV Substation with additional capacity of 5606 MVA.