Transmission
Lines

For transmission line projects, we offer specialized services that cover every stage of development to
ensure efficient and reliable power evacuation. Our work starts with pre-feasibility and feasibility studies, including route optimization, topographical surveys, and environmental and social impact assessments to identify the most sustainable and cost-effective corridors. We then deliver robust detailed engineering designs for towers, foundations, and line configurations, followed by the preparation of comprehensive tender documents. Throughout the construction phase, we provide vigilant construction supervision and project management, ensuring that all work meets stringent safety and quality standards. Our services also extend to crucial aspects like land acquisition and compensation planning, and continuous technical, environmental, and social monitoring to guarantee compliance and successful project delivery.

Explore Projects

Explore Projects

Project List

  • TL-1 Hetauda – Dhalkebar – Duhabi 400 kV Transmission Line Project
  • TL-17 Makarigad Gaun – Balanch 33 kV Transmission Line Project in Darchula district, Nepal.
  • TL-2 220 kV Double Circuit Transmission line from Isuwa Khola PRoR Cascade Hydro Electric Project to 220 kV/132 kV Shitalpati Substation (IKHEP)
  • TL-18 Consulting Services for Detailed Survey and Updated Line Design for 30 km of Changes in 400 kV Transmission Line Route Alignment.
  • TL-3 Resettlement and Rehabilitation (R & R) Plan preparation of 400 kV Double Circuit Transmission Line (length – 210 km)
  • TL-18 Consultant/Engineer for Design Review and Construction Supervision of Electricity Distribution System- Extension and Upgradation Procurement Ref. Number: MCA-N/ETP/QCBS/012
  • TL-3 Arun-3 HPP-33 kV TL Project
  • TL-20 Consulting Services for Project Supervision Consultant (Phase II) – Electricity Transmission Expansion & Supply Improvement Project for TL 400 kV Tamakoshi (Khimti) – Kathmandu Transmission Line and associated Substations.
  • TL-4 132 kV Single Circuit Transmission Line from Luja Khola Hydro Electric Project to 132 kV /33 kV Tingla (LJKHEP)
  • TL-20 Tamakoshi (Khimti) – Kathmandu 220 kV/400 kV Transmission Line Project (Khimti-Barhabise 220 kV TL 44 and Barhabise – Kathmandu 400/220 kV TL -60 and associated substations
  • TL-5 132 kV Transmission Line of Langtang Khola Hydroelectric Project (20 MW), Rasuwa District
  • TL-21 Upper Trishuli-I HEP 220 kV Transmission Line Project
  • SASEC (South Asia Sub regional Economic Cooperation) Power System Expansion Project-PPS
    TL-6/ TL-7/TL-8 220 kV Kaligandaki Corridor TL Project
    TL-9/ TL-10 220 kV Marsyangdi Corridor TL project
    TL-11 220 kV Marsyangdi – Kathmandu TL Project
  • TL-22 Khimti Dhalkebar 220 kV Transmission Line Project
  • TL-15 Karmadev – Phukot 400 kV Double Circuit Karnali Corridor Transmission Line Project
  • TL-23 Lower Arun – Dhalkebar 400 kV Transmission Line Project
  • TL-28 Study for Environmental and Social Considerations for “The Project for Construction of Transmission and Distribution Network Development in Nepal”
  • TL- 40 SASEC (South Asia Sub regional Economic Cooperation) Power System Expansion Project-PSC
    TL-6/ TL-7/ TL-8 220 kV Kaligandaki Corridor TL Project
    TL-9/ TL-10 220 kV Marsyangdi Corridor TL project
    TL-11 220 kV Marsyangdi – Kathmandu TL Project
    TL-19 132 kV Samudratar Trishuli 3B Hub TL Project
    Distribution System Expansion in Eastern, Central, Western Nepal
  • TL-57 Reconstruction and Improvement of Electricity in Earthquake affected Districts of Rasuwa & Nuwakot.
  • TL-29 Assessment for Private Sector Involvement in Power Transmission in The Asia Pacific Region
  • Client – Nepal Electricity Authority (NEA) (World Bank Fund)

    Scope – Construction Supervision and Substation Design.

  • Client – Hydro Vision Pvt. Ltd.

    Works – Feasibility Study of 27 km, 33 kV Transmission Line including Topographic survey, Cost Estimation, Geographical and Geological Survey, Design and Project Component Optimization.

  • Client – Isuwa Energy Pvt. Ltd.

    Works – Preparation of Feasibility Study & Tender Documents, Desk Study of Interconnection Point, Tower Spotting and Tower Optimization in PLS-CADD, Check Survey and Preparation of Tender Documents

  • Client – Millennium Challenge Account Nepal (MCA-Nepal)

    Works – Inception of the assignment, Detailed Field survey and preliminary engineering design, Geo-technical Investigation, Detailed Environmental and Social Assessment, Pegging activities and Preparation of final survey report.

  • Client – SJVN Arun-3 HPP Power Development Company (SAPDC)

    Works – Cadastral Map Verification, Social and Environmental Survey, Preparation of Resettlement and Rehabilitation plan, Supplementary IEE , Detailed Survey & Design of Changed Portion of the 400 kV Transmission Line.

  • Client – Mellenium Challenge Account-Nepal (MCA-NEPAL)
    Funding Agency – MCC-United States of America

    Works – Consultant/Engineer for Design Review and Construction Supervision

  • Client – SJVN Arun-3 Power Development Company P. Ltd.

    Works – Survey & Investigation for Proposed 33 kV Transmission Line Preparation of IEE Report

  • Client – NEA | Funding Agency – ADB

    Works – Design review, quality monitoring, and construction supervision

  • Client – Silk Power Pvt. Ltd.

    Works – Tower Spotting & Tower Optimization in PLS-CADD, Check Survey, Preparation of Technical Specifications & Tender Documents

  • TL-20 Tamakoshi (Khimti) – Kathmandu 220 kV/400 kV Transmission Line Project (Khimti-Barhabise 220 kV TL 44 and Barhabise – Kathmandu 400/220 kV TL -60 and associated substations
    Funding Agency – (World Bank Fund)

    Works – Preparation of technical specifications and bidding documents, Support in bidding process, Supervision during construction, testing and commissioning, quality monitoring an construction supervision

  • Client – Multi Energy Development Pvt. Ltd.

    Works – Feasibility study and design of about 4.5 km, Single circuit 132 kV transmission line

  • Client – Nepal Water and Energy Development Co. Pvt. Ltd (NWEDC)

    Works – Detail TL Survey and Design, and IEE Study

  • Client – Asian Development Bank (Implementing Agency-NEA)

    Works – Assistance to NEA in preparing designs, technical specifications and bidding documents. Assistance to NEA in the bidding process and bid evaluation including preparation of technical and financial evaluation reports. Assistance to NEA in contract negotiation with the contractor until contract awarded and advance payment paid.

  • Client – Nepal Electricity Authority (NEA) (World Bank Fund)

    Works – Consultancy for planning design, preparation of bidding document with detail specification, bid evaluation and contact negotiation, design review, quality assurance, construction supervision, contract management and knowledge transfer etc. (In association with Power Grid INDIA)

  • Client – Rastriya Prasaran Grid Company Limited

    Works – Detailed Engineering Design and Enviornmental Study of Transmission Line and Substations. Preparation of Technical Specifications and Tender Documents. Karmadev (Indo-Nepal Border – Phukot (Kalikot) is a 130 km double circuit line project, which also includes two 400 kV GIS substations at Phukot and Betan.

  • Client – Lower Arun Hydroelectric Co. P. Ltd

    Works – Desk Study

  • Client – NEWJEC Inc, Japan (Funded by JICA)

    Works – Environmental and social assessment for the construction of 132 kV/ 11 kV Birauta S/S including underground transmission line, preparation of IEE report including RAP.

  • Client – Asian Development Bank (Implementing Agency-NEA)

    Works – Grid Substation Reinforcement Sub Project, Construction Supervision of Transmission Line & Substation

  • Client – Nepal Electricity Authority (Funded by KfW and EIB)

    Works – Engineering Design, Bidding Document Preparation, Environmental and Social Studies & Construction Supervision

  • Client – IFC

    Works – Identify specific domestic and cross-border transmission projects that could be considered for possible private sector investment, and prepare and propose amendments to already available tools, documents, and templates for supporting the structuring of these projects.