Transmission
Lines
The 400 kV Quad Moose Double Circuit Transmission Line project spans a total of 315 km, of which 90% of the routing was completed by a former consultant. However, due to stakeholder grievances, a 30 km section of the alignment required to be rerouted. Jade Consult has been engaged to undertake the survey and design of this remaining 10% (30 km), ensuring the development of a technically feasible, environmentally viable, and socially acceptable route that integrates seamlessly with the previously approved segments. The finalized alignment will form part of the complete transmission line corridor to be handed over to the Design and Build Contractor for execution.
Client : Millennium Challenge Account Nepal (MCA-Nepal)
Funding Agency : Millennium Challenge Corporation (MCC)
Scope of Works : Inception of the Assignment, Detailed Field Survey and Preliminary Engineering Design, Geotechnical Investigation, Detailed Environment & Social Assessment including Flood Risk Assessment, Pegging activities, Preparation of final survey report after finalization of route & site verification
Project Features: Length – approx. 33 km, Voltage Level – 400 kV, Circuit – Double Circuit, Tower – Tall and narrow base steel lattice towers, Conductor – ACSR Quad “MOOSE”, Province – Bagmati, Gandaki, and Lumbini, District- Dhading, Nuwakot, Makawanpur, Tanahu, Chitwan, & Nawalparasi West