
& Dams
We provide a full suite of services for hydropower projects, guiding them from the initial concept through to long-term operation. Our expertise begins with comprehensive pre-feasibility and feasibility studies, which include detailed environmental, social, hydrological, and geotechnical investigations to ensure project viability. We then proceed with meticulous detailed engineering design and tender document preparation, translating conceptual plans into buildable blueprints. During the construction phase, we offer expert construction supervision, project management, and owner’s engineer services to ensure quality, safety, and adherence to timelines. Finally, we provide post-construction support with services in operations and maintenance, as well as rehabilitation and upgrading to enhance performance and extend the asset’s lifespan.
Project List
-
HP-1 Upper Trishuli – I Hydroelectric Project (216 MW)
-
HP-7 Lower Barun (132 MW)
-
HP-40 Upper Chameliya Hydropower Project (60 MW), Darchula District
-
HP-44 Jum Khola Hydropower Project (56 MW)
-
HP-47 Khimti-2 Hydropower Project (48.8 MW)
-
HP-48 Langtang Khola Hydroelectric Project (20 MW)
-
HP-49 Contract Management and Related Works for Construction of Sunkoshi Marin Diversion Multipurpose Project
-
HP-51 Mid Hongu Khola – A Hydropower Project (22 MW)
-
HP-52 Upper Piluwa Khola 3 Hydropower Project (4.95 MW)
-
HP-53 Rele Khola Hydropower Project (6 MW)
-
HP-54 Kaligandaki Storage Hydropower Project (844 MW), Parbat & Myagdi District
-
HP-55 Isuwa Khola Hydropower Project (97.2 MW)
-
HP-21 Upper Seti Hydropower Project (20 MW)
-
HP-56 Nyasim Khola Hydropower Project (35 MW), Sindhupalchowk
-
HP-57 Upper Irkhuwa Khola HPP (14.5 MW)
-
HP-58 Isuwa Khola PROR Cascade HPP (40.1 MW)
-
HP-59 Mugu Karnali Storage Hydro Electric Project (MKHEP) (1902 MW)
-
HP-60 Babai Mankhola Diversion Project (46.80 MW)
-
HP-61 Upper Myagdi-1 HPP (53.5 MW)
-
HP-62 Kabeli-A HEP (37.6 MW)
-
HP-63 Mewa Khola Hydropower Project (24 MW)
-
HP-64 Mathillo Chujung Khola Hydropower Project (50.5 MW)
-
HP-65 Super Tamor Khola HEP (166 MW)
-
HP-66 Simbuwa Khola Hydroelectric Project, Taplejung District, Nepal (70.3 MW)
-
HP-67 Upper Arun HPP (1040 MW)
-
HP-68 Maccha Khola HPP (16 MW)
-
HP-69 Upper Karnali HPP (900 MW), Achham Dailekh, Surkhet
-
HP-70 Sankhuwa Khola Hydropower Project (41.06 MW), Sankhuwasabha
-
HP-74 Super Lower Bagmati Hydropower Project (41.86 MW)
-
HP-78 Upper Gaddi Gad Hydropower Project (1.55 MW), Doti
-
HP-69 Upper Karnali HPP (900 MW), Achham Dailekh, Surkhet
-
HP-81 Aayu Malun HPP (40 MW)
-
HP-82 Upper Piluwa Hills Small Hydropower Project (4.99 MW)
-
HP-83 Lower Hewa Khola HEP (22.1 MW)
-
Client – Nepal Water and Energy Development Company Pvt. Ltd
Funded by IFC, ADB, AIIB, K-EXIM, KDB, CDC, FMO, PROPARCO and OFID.
Works – Owner’s Engineer Services, Design Review, Construction Supervision, Contract Administration, Environmental & Social Safeguards Implementation & Compliance Monitoring
-
Client – Ampik Energy Pvt. Ltd.
Works – Detailed Design Works and Tender Document Preparation
-
Client – Department of Electricity Development
Works – Feasibility and Environmental Impact Assessment (EIA) study
-
Client – Nabil Bank Limited | Developer- Sanima Jum Hydropower Limited
Works – Due Diligence Study of the Jum Khola
-
Client – Consortium led by Sanima Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Sunrise Bank Ltd.
Works – Tehnical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Department of Water Resources and Irrigation
Funding Agency: Government of Nepal
Works – The work involves design review, construction supervision, quality control, project management, construction and contract management
-
Client – Consortium led by Sanima Bank
Works – Technical Consultant for Bill Verification Work & Construction Monitoring
-
Client – Consortium led by Laxmi Bank Limited
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Himalayan Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Department of Electricity Development
Works – Feasibility Study and Environmental Impact Assessment Study.
-
Client – Sanima Bank Ltd.
Developer – KBNR Isuwa Power Ltd.
Works – Technical Bill Verification and Progress monitoring -
Client – Upper Seti Hydro Pvt. Ltd.
Works – Detail Design of all project structures including 2.51 km HRT, preparation of Tender Documents, survey & design of access road & Transmission line, hydrological & sedimentological studies, geological mapping.
-
Client – Sita Hydropower Company Pvt. Ltd.
Works – Project Management Consultant Service for Construction Supervision and partial design review.
-
Client – Consortium Led by Machhapuchchhre Bank Limited
Works – Technical Bill Verification and Progress monitoring
-
Client – Consortium Led by Siddhartha Bank Limited
Works – Technical Consultant for Bill Verification works and Progress Monitoring
-
Client – Vidhyut Utpadan Company Limited
Works – Environmental Impact Assessment (EIA) Study
-
Client – Department of Water Resources and Irrigation
Works – Detail Feasibility Study
-
Client – Consortium Led by Sanima Bank Limited
Works – Technical Bill Verification and Progress monitoring
-
Client – Consortium Led by Kumari Bank Limited
Works – Technical Bill Verification and Progress monitoring
-
Client – Union Mewa Hydro Ltd.
Works – Updated Feasibility Study, Detailed Project Report, Detailed Engineering Design and Preparation of Tender Documents along with 132 kV Transmission Line Study and Design of Project Road
-
Client – Chujung Khola Hydropower Co. Ltd.
Works – Detail Feasibility Study including field investigation (Hydrological and sedimentological study, Geological mapping, Topographical survey) and Detail Engineering Design and Preparation of Tender document.
-
Client – Crystal Power Development Limited
Works – Detailed Engineering Design and Preparation of Tender document.
-
Client – Remit Hydro Ltd.
Works – Updating Feasibility Study, Conducting Detailed Engineering Survey & Design and Preparation of Tender Documents
-
Client – Upper Arun Hydroelectric Limited
Works – Tender Design, Construction Supervision, Post Construction Services
-
Client – Water Energy Development Private Limited
Works – Detail Engineering Design, Preparation of Tender Documents & Construction Drawings
-
Client – GMR
Works – E&S Baseline Data Collection, Downstream Impact Assessment and E-flow Assessment Study, Rapid Cumulative Impact Assessment (CIA)
-
Client – Guras Hydro Pvt. Ltd.
Works – Due Deligence Study
-
Client – Super Bagmati Hydropower Limited
Works – Construction Supervision including Design review and update
-
Client – Saileshwari Power Nepal Limited
Works – Technical Support
-
Client – GMR
Works – E&S Baseline Data Collection, Downstream Impact Assessment and E-flow Assessment Study, Rapid Cumulative Impact Assessment (CIA)
-
Client / Developer – Aayu Malun Hydropower Pvt. Ltd.
Works – Progress Monitoring and Bill Verification
-
Client / Developer – Milke Jaljale Hydropower Pvt. Ltd. and Laxmi Sunrise Bank
Works – Progress Monitoring and Bill Verification
-
Client – Mountain Hydro Nepal Ltd.
Works – Flood Damage Assessment
-
Five Dams in Dang Valley
-
HP-1 Upper Trishuli – 1 HEP (216 MW)
-
HP-1 Upper Trishuli-I HEP (216 MW)
-
HP-5 Manang Marsyangdi Hydropower Project (144 MW)
-
HP-6 Saptang Khola Small Hydropower Project (2.5 MW)
-
HP-7 Lower Barun Khola Hydropower Project (132 MW)
-
HP-8 Budhi Gandaki HPP (1200 MW)
-
HP-9 Rawa Khola HEP (6.5 MW)
-
HP-10 Upper Marsyangadi-III HEP (121 MW)
-
HP-11 Upper Marsyangadi-II HEP (125 MW)
-
HP-11 Upper Marsyangadi-II HEP, Optimization (250MW)
-
HP-13 Lower Arun HEP (400 MW)
-
HP-14 Upper Modi HEP (14 MW)
-
HP-15 Low Head Kaligandaki HEP (30 MW)
-
HP-16 Talkot Seti HEP (75 MW)
-
HP-17 Deku Khola (3.4 MW)
-
HP-18 Tila HEP (500 MW)
-
HP-19 Chhere Khola (12 MW)
-
HP-20 Phukot Karnali HEP (210 MW)
-
HP-21 Upper Seti Hydropower Project (20 MW)
-
HP-22 Upper Lapche Khola (52 MW)
-
HP-23 Karuwa Hydropower Project (36 MW), Kaski
-
HP-24 Bheri-1 Hydropower Project (270 MW)
-
HP-25 Jawa Khola HPP (17.2 MW)
-
HP-26 Tamakoshi V Hydroelectric Project (99.8 MW)
-
HP-26 Tamakoshi V Hydroelectric Project (99.8 MW)
-
HP-27 Lower Likhu HPP (28.1 MW)
-
HP-28 Upper Jeuligad Small Hydroelectric Project (4 MW)
-
HP-29 Upper Khudi Hydropower project (21.21 MW)
-
HP-30 Sapsup Khola Small Hydropower Project (6.6 MW)
-
HP-31 Budhi Gandaki Nadi HEP (91.17 MW), Gorkha
-
HP-32 Kabeli-3 HEP (21.93 MW), Taplejung
-
HP-33 Lower Tadi Khola HPP (5 MW)
-
HP-34 Likhu-IV Hydroelectric Project (52.4 MW)
-
HP-35 Likhu-A Hydropower Project (24.2 MW)
-
HP-36 Nyadi Hydropower Project (30 MW)
-
HP-37 Chujung Khola Hydropower Project (48 MW)
-
HP-38 Mai Beni Hydropower Project (9.51 MW) and HP-39 Lower Jogmai Khola Hydropower Project (6.2 MW)
-
HP-40 Upper Chamelia HPP (53.85 MW)
-
HP-41 Upper Balephi HPP (46 MW)
-
HP-42 Bhotekoshi HPP (44 MW)
-
HP-43 Buku Khola HEP (6 MW)
-
HP-44 Jum Khola Jalvidhyut Aayojana (56 MW)
-
HP-38 (Mai Beni (9.51 MW), HP-39 Lower Jogami (6.2 MW) and HP-45 Middle Mewa (73.5 MW)
-
HP-46 Irkhuwa Khola B HEP (15 MW)
-
HP-47 Khimti-II HPP (48.8 MW)
-
HP-48 Langtang Khola HPP (20 MW)
-
HP-70 Sankhuwa Khola HEP (41.06 MW)
-
HP-72 Balephi Khola HEP (40 MW)
-
HP-73 Bajhang Upper Seti HPP (216 MW)
-
HP-727 Upper Tamor Hydropower Project (285 MW), Taplejung
-
HP-75 Miwaje Khola HPP (5MW), Kaski
-
HP-79 Tamakoshi-3 HEP (650 MW), Dolkha
-
Client – Mega Dang Valley Irrigation Project
Works – Feasibility Study, IEE & Detailed Design of 5 Dams :
D-1 Dam at Vitri Khola – 29 m (Earthen Dam)
D-2 Dam at Gwar Khola – 125 m (Clay Core Rockfill Dam)
D-3 Dam at Balim Khola – 70 m (Clay Core Rockfill Dam)
D-4 Dam at Vutiya Tal/ Tuhi Khola – 15 m (Earthen Dam)
D-5 Dam at Ranighat Khola – 43 m (Earthen Dam) -
Client – Nepal Water and Energy Development Company Pvt. Ltd.
Works – Assistance in Preperation of Detailed Design, Drawings & Cost Estimates
-
Client – Nepal Water and Energy Development Company Pvt. Ltd
Works – Project investigation, Design and Detailed Feasibility Study. Preparation of EIA, ToR Scoping and EIA report, Survey, Design and Drawing preparation of access road
-
Client – Marsyangdi Power Company P. Ltd.
Works – Design review, Cost review, financial analysis, preparation of construction schedule, Power and Energy calculation for Peaking RoR, Power Evacuation Study, facilitation of Grid Connection Agreement and Power Purchase Agreement
-
Client – Machhapuchhre Bank Limited
Works – Prepare Due Diligence Study Report, review and independent analysis of hydrology and geological study, review and independent assessment of installed capacity and energy generation, review and independent analysis of transmission plan, review of design parameters and criteria, verification of cost estimates, financial analysis
-
Client – Ampik Energy Pvt. Ltd.
Works – Geotechnical investigation that includes 265 m of core drilling and associated laboratory tests.
-
Client – Budhigandaki Hydropower Development Committee
Works – Feasibility study, Detailed Design Report & Tender documents preparation and EIA Studies
-
Client – Dudh Koshi Power Company Pvt. Ltd.
Works – Detailed Engineering Design & Tender Documents Preparation
-
Client – VA TECH Hydro, Switzerland
Works – Investigation, Detailed Feasibility Study of the project, which includes Topographical survey, Geological mapping & investigation, Hydrological analysis EIA study etc.
-
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation, Design and Detailed Feasibility Study.
-
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation of optimal plant capacity. Detail analysis of the project alternatives. Preparation of optimization study report.
-
Client – Bras Power International, Brazil
Works – Hydrological gauging station establishment, Land Acquisition, Survey, Design and Drawing preparation for approximately 26 km long access road
-
Client – GITEC Nepal Pvt. Ltd
Works – Upgrading and Detailed Feasibility Report and ACRP Report.
-
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – H20 Hydropower
Works – Inventory study & Preparation of Desk Study report
-
Client – GCE Group Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – Tila Hydropower
Works – Inventory study & Preparation of Desk Study report
-
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – PES Engineers Pvt. Ltd.
Works – Preparation of Desk Study report
-
Client – Upper Seti Hydropower Pvt. Ltd.
Works – Feasibility Study including Field Investigation (Hydrological & Sedimentological Study, Geological Mapping, Topographical Survey)
-
Client – Energy Venture Pvt. Ltd.
Works – Review of Feasibility Study & Detail Project Report. Detail Engineering Design with reinforcement drawing. Preparation of Tender Documents
-
Client – Jhaymolonga Hydropower Company P. Ltd
Works – Detail design of all project structures including 3.5 km HRT, preparation of tender documents, survey and design of access road and transmission line, hydrological and sedimentological studies, geological mapping.
-
Client – Gezhouba Group Power Investment Nepal Pvt. Ltd.
Works – Review of Feasibility Study
-
Client – Department of Electricity Development
Works – Feasibility Study and IEE Study
-
Client – Tamakoshi Jalvidyut Company Limited
Funded by Asian Infrastructure Investment Bank
Works – Restructure Environmental Management Action Plan (EMAP), prepare Stakeholder Engagement Plan, prepare Monitoring Plan, conduct Cumulative Impacts Assessment, Climate Change Assessment, develop Pollution control strategy, develop Public Health and Safety Strategy, develop Local employment strategy, prepare Land acquisition and Livelihood Restoration Plan, Environmental Flows and Ecosystem Services Assessment, develop E&S actions to be implemented by the Developer, develop E&S specifications for the EPC contractor. Preparation of Supplemental Environmental and Social Documentation (SESD)
-
Client – Tamakoshi Jalvidyut Company Limited
Funding Agency – Asian Infrastructure Investment Bank
Works – To conduct and prepare Critical Habitat Assessment, Consultation and Partnership Building Strategy, Mitigation Strategies and Biodiversity Action Plan (BAP) -
Client – Consortium led by Laxmi Bank
Works – Due Diligence Study for Cost Overrun
-
Client – Woonsun Energy & Construction Co. Ltd., Seoul, Korea
Works – Feasibility study
-
Client – Bank of Kathmandu
Works – Due Diligence Study.
-
Client – Himalayan Bank Ltd.
Works – Technical Bill Verification and Progress monitoring
-
Client – Surya Energy
Works – Detail Feasibility including field investigation (hydrological and sedimentological study, geological mapping, topographical survey) & EIA
-
Client – Kabeli HP Dev. Co. P Ltd
Works – Detail Design of all project structures such as headworks, headrace tunnel, penstock, powerhouse, camp facilities, access road including hydrological & sedimentological studies and geological mapping.
-
Client – Consortium led by Siddhartha Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Everest Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Chujung Khola Hydropower Co. Ltd.
Works – Detail Feasibility Study including field investigation (Hydrological and sedimentological study, Geological mapping, Topographical survey)
-
Client – Urja Developers Pvt. Ltd
Works – Social Assessment and Biodiversity Assessment
-
Client – Department of Electricity Development
Works – Feasibility and Environmental Impact Assessment (EIA) study
-
Client – Laxmi Sunrise Bank Limited
Works – Due Diligence Study
-
Client – Nepal Infrastructure Bank Limited
Works – Due Diligence Study
-
Client – Himalayan Bank Limited
Works – Due Diligence Study
-
Client – Nabil Bank Limited
Developer – Sanima Jum Hydropower Limited
Works – Due Diligence Study of the Jum Khola -
Client – IFC
Works – Due Diligence study, a high-level technical appraisal of the 3 hydro projects
-
Client – Laxmi Bank Ltd.
Works – Due Diligence Work
-
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
Client – Citizen Bank International Ltd.
Works – Due Diligence Study
-
Client – Balephi Energy Pvt. Ltd.
Works – Due Dilligence Study
-
Client – Kumari Bank Ltd.
Works – Due Delligence Study
-
Client – Tamor Energy Pvt. Ltd.
Works – Technical document review of underground works
-
Client – Maa Durga Kali Hydropower Company Pvt. Ltd.
Works – Detailed Project Report (DPR)
-
Client – T-3 Hydro Company Pvt. Ltd.
Works – Pre-feasibility Study
-
HP-50 Lower Kopili Hydroelectric Project (120 MW), Assam, India
-
HP-80 Bunakha Hydropower Project (180 MW) – Bhutan
-
Harsi Small Hydroelectric Project (2.4 MW)
-
Mohini Small Hydroelectric Project (1.2 MW)
-
Client – Assam Power Generation Corporation Limited (Funded by ADB)
Works – Independent monitoring of implementation of Social and Environ-ment safeguards during design, construction and operation phases
-
Client – Druk Green Power Corporation Limited (DGPC)
Funding – Agency Asian Development Bank (ADB)
Works: Review and update of Detailed Project Report and Environment and Social Impact Assessment (ESIA)
-
Client/ Developer – Vensar Constructions Company
Works – Tender Documents (Civil, HM, EM and TL), Detail Engineering Design, Construction Drawing, Design Review of HM, EM and TL
-
Client/ Developer – Vensar Constructions Company
Works – Tender Documents (Civil, HM, EM and TL), Detail Engineering Design, Construction Drawing, Design Review of HM, EM and TL
Project List
-
Client – Mega Dang Valley Irrigation Project
Works – Feasibility Study, IEE & Detailed Design of 5 Dams :
D-1 Dam at Vitri Khola – 29 m (Earthen Dam)
D-2 Dam at Gwar Khola – 125 m (Clay Core Rockfill Dam)
D-3 Dam at Balim Khola – 70 m (Clay Core Rockfill Dam)
D-4 Dam at Vutiya Tal/ Tuhi Khola – 15 m (Earthen Dam)
D-5 Dam at Ranighat Khola – 43 m (Earthen Dam) -
Client – Nepal Water and Energy Development Company Pvt. Ltd.
Works – Assistance in Preperation of Detailed Design, Drawings & Cost Estimates
-
Client – Nepal Water and Energy Development Company Pvt. Ltd
Works – Project investigation, Design and Detailed Feasibility Study. Preparation of EIA, ToR Scoping and EIA report, Survey, Design and Drawing preparation of access road
-
Client – Marsyangdi Power Company P. Ltd.
Works – Design review, Cost review, financial analysis, preparation of construction schedule, Power and Energy calculation for Peaking RoR, Power Evacuation Study, facilitation of Grid Connection Agreement and Power Purchase Agreement
-
Client – Machhapuchhre Bank Limited
Works – Prepare Due Diligence Study Report, review and independent analysis of hydrology and geological study, review and independent assessment of installed capacity and energy generation, review and independent analysis of transmission plan, review of design parameters and criteria, verification of cost estimates, financial analysis
-
Client – Ampik Energy Pvt. Ltd.
Works – Geotechnical investigation that includes 265 m of core drilling and associated laboratory tests.
-
Client – Budhigandaki Hydropower Development Committee
Works – Feasibility study, Detailed Design Report & Tender documents preparation and EIA Studies
-
Client – Dudh Koshi Power Company Pvt. Ltd.
Works – Detailed Engineering Design & Tender Documents Preparation
-
Client – VA TECH Hydro, Switzerland
Works – Investigation, Detailed Feasibility Study of the project, which includes Topographical survey, Geological mapping & investigation, Hydrological analysis EIA study etc.
-
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation, Design and Detailed Feasibility Study.
-
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation of optimal plant capacity. Detail analysis of the project alternatives. Preparation of optimization study report.
-
Client – Bras Power International, Brazil
Works – Hydrological gauging station establishment, Land Acquisition, Survey, Design and Drawing preparation for approximately 26 km long access road
-
Client – GITEC Nepal Pvt. Ltd
Works – Upgrading and Detailed Feasibility Report and ACRP Report.
-
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – H20 Hydropower
Works – Inventory study & Preparation of Desk Study report
-
Client – GCE Group Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – Tila Hydropower
Works – Inventory study & Preparation of Desk Study report
-
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
Client – PES Engineers Pvt. Ltd.
Works – Preparation of Desk Study report
-
Client – Upper Seti Hydropower Pvt. Ltd.
Works – Feasibility Study including Field Investigation (Hydrological & Sedimentological Study, Geological Mapping, Topographical Survey)
-
Client – Energy Venture Pvt. Ltd.
Works – Review of Feasibility Study & Detail Project Report. Detail Engineering Design with reinforcement drawing. Preparation of Tender Documents
-
Client – Jhaymolonga Hydropower Company P. Ltd
Works – Detail design of all project structures including 3.5 km HRT, preparation of tender documents, survey and design of access road and transmission line, hydrological and sedimentological studies, geological mapping.
-
Client – Gezhouba Group Power Investment Nepal Pvt. Ltd.
Works – Review of Feasibility Study
-
Client – Department of Electricity Development
Works – Feasibility Study and IEE Study
-
Client – Tamakoshi Jalvidyut Company Limited
Funded by Asian Infrastructure Investment Bank
Works – Restructure Environmental Management Action Plan (EMAP), prepare Stakeholder Engagement Plan, prepare Monitoring Plan, conduct Cumulative Impacts Assessment, Climate Change Assessment, develop Pollution control strategy, develop Public Health and Safety Strategy, develop Local employment strategy, prepare Land acquisition and Livelihood Restoration Plan, Environmental Flows and Ecosystem Services Assessment, develop E&S actions to be implemented by the Developer, develop E&S specifications for the EPC contractor. Preparation of Supplemental Environmental and Social Documentation (SESD)
-
Client – Tamakoshi Jalvidyut Company Limited
Funding Agency – Asian Infrastructure Investment Bank
Works – To conduct and prepare Critical Habitat Assessment, Consultation and Partnership Building Strategy, Mitigation Strategies and Biodiversity Action Plan (BAP) -
Client – Consortium led by Laxmi Bank
Works – Due Diligence Study for Cost Overrun
-
Client – Woonsun Energy & Construction Co. Ltd., Seoul, Korea
Works – Feasibility study
-
Client – Bank of Kathmandu
Works – Due Diligence Study.
-
Client – Himalayan Bank Ltd.
Works – Technical Bill Verification and Progress monitoring
-
Client – Surya Energy
Works – Detail Feasibility including field investigation (hydrological and sedimentological study, geological mapping, topographical survey) & EIA
-
Client – Kabeli HP Dev. Co. P Ltd
Works – Detail Design of all project structures such as headworks, headrace tunnel, penstock, powerhouse, camp facilities, access road including hydrological & sedimentological studies and geological mapping.
-
Client – Consortium led by Siddhartha Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Everest Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Chujung Khola Hydropower Co. Ltd.
Works – Detail Feasibility Study including field investigation (Hydrological and sedimentological study, Geological mapping, Topographical survey)
-
Client – Urja Developers Pvt. Ltd
Works – Social Assessment and Biodiversity Assessment
-
Client – Department of Electricity Development
Works – Feasibility and Environmental Impact Assessment (EIA) study
-
Client – Laxmi Sunrise Bank Limited
Works – Due Diligence Study
-
Client – Nepal Infrastructure Bank Limited
Works – Due Diligence Study
-
Client – Himalayan Bank Limited
Works – Due Diligence Study
-
Client – Nabil Bank Limited
Developer – Sanima Jum Hydropower Limited
Works – Due Diligence Study of the Jum Khola -
Client – IFC
Works – Due Diligence study, a high-level technical appraisal of the 3 hydro projects
-
Client – Laxmi Bank Ltd.
Works – Due Diligence Work
-
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
Client – Citizen Bank International Ltd.
Works – Due Diligence Study
-
Client – Balephi Energy Pvt. Ltd.
Works – Due Dilligence Study
-
Client – Kumari Bank Ltd.
Works – Due Delligence Study
-
Client – Tamor Energy Pvt. Ltd.
Works – Technical document review of underground works
-
Client – Maa Durga Kali Hydropower Company Pvt. Ltd.
Works – Detailed Project Report (DPR)
-
Client – T-3 Hydro Company Pvt. Ltd.
Works – Pre-feasibility Study
-
Client – Nepal Water and Energy Development Company Pvt. Ltd
Funded by IFC, ADB, AIIB, K-EXIM, KDB, CDC, FMO, PROPARCO and OFID.
Works – Owner’s Engineer Services, Design Review, Construction Supervision, Contract Administration, Environmental & Social Safeguards Implementation & Compliance Monitoring
-
Client – Ampik Energy Pvt. Ltd.
Works – Detailed Design Works and Tender Document Preparation
-
Client – Department of Electricity Development
Works – Feasibility and Environmental Impact Assessment (EIA) study
-
Client – Nabil Bank Limited | Developer- Sanima Jum Hydropower Limited
Works – Due Diligence Study of the Jum Khola
-
Client – Consortium led by Sanima Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Sunrise Bank Ltd.
Works – Tehnical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Department of Water Resources and Irrigation
Funding Agency: Government of Nepal
Works – The work involves design review, construction supervision, quality control, project management, construction and contract management
-
Client – Consortium led by Sanima Bank
Works – Technical Consultant for Bill Verification Work & Construction Monitoring
-
Client – Consortium led by Laxmi Bank Limited
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Consortium led by Himalayan Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
Client – Department of Electricity Development
Works – Feasibility Study and Environmental Impact Assessment Study.
-
Client – Sanima Bank Ltd.
Developer – KBNR Isuwa Power Ltd.
Works – Technical Bill Verification and Progress monitoring -
Client – Upper Seti Hydro Pvt. Ltd.
Works – Detail Design of all project structures including 2.51 km HRT, preparation of Tender Documents, survey & design of access road & Transmission line, hydrological & sedimentological studies, geological mapping.
-
Client – Sita Hydropower Company Pvt. Ltd.
Works – Project Management Consultant Service for Construction Supervision and partial design review.
-
Client – Consortium Led by Machhapuchchhre Bank Limited
Works – Technical Bill Verification and Progress monitoring
-
Client – Consortium Led by Siddhartha Bank Limited
Works – Technical Consultant for Bill Verification works and Progress Monitoring
-
Client – Vidhyut Utpadan Company Limited
Works – Environmental Impact Assessment (EIA) Study
-
Client – Department of Water Resources and Irrigation
Works – Detail Feasibility Study
-
Client – Consortium Led by Sanima Bank Limited
Works – Technical Bill Verification and Progress monitoring
-
Client – Consortium Led by Kumari Bank Limited
Works – Technical Bill Verification and Progress monitoring
-
Client – Union Mewa Hydro Ltd.
Works – Updated Feasibility Study, Detailed Project Report, Detailed Engineering Design and Preparation of Tender Documents along with 132 kV Transmission Line Study and Design of Project Road
-
Client – Chujung Khola Hydropower Co. Ltd.
Works – Detail Feasibility Study including field investigation (Hydrological and sedimentological study, Geological mapping, Topographical survey) and Detail Engineering Design and Preparation of Tender document.
-
Client – Crystal Power Development Limited
Works – Detailed Engineering Design and Preparation of Tender document.
-
Client – Remit Hydro Ltd.
Works – Updating Feasibility Study, Conducting Detailed Engineering Survey & Design and Preparation of Tender Documents
-
Client – Upper Arun Hydroelectric Limited
Works – Tender Design, Construction Supervision, Post Construction Services
-
Client – Water Energy Development Private Limited
Works – Detail Engineering Design, Preparation of Tender Documents & Construction Drawings
-
Client – GMR
Works – E&S Baseline Data Collection, Downstream Impact Assessment and E-flow Assessment Study, Rapid Cumulative Impact Assessment (CIA)
-
Client – Guras Hydro Pvt. Ltd.
Works – Due Deligence Study
-
Client – Super Bagmati Hydropower Limited
Works – Construction Supervision including Design review and update
-
Client – Saileshwari Power Nepal Limited
Works – Technical Support
-
Client – GMR
Works – E&S Baseline Data Collection, Downstream Impact Assessment and E-flow Assessment Study, Rapid Cumulative Impact Assessment (CIA)
-
Client / Developer – Aayu Malun Hydropower Pvt. Ltd.
Works – Progress Monitoring and Bill Verification
-
Client / Developer – Milke Jaljale Hydropower Pvt. Ltd. and Laxmi Sunrise Bank
Works – Progress Monitoring and Bill Verification
-
Client – Mountain Hydro Nepal Ltd.
Works – Flood Damage Assessment
-
Client – Assam Power Generation Corporation Limited (Funded by ADB)
Works – Independent monitoring of implementation of Social and Environ-ment safeguards during design, construction and operation phases
-
Client – Druk Green Power Corporation Limited (DGPC)
Funding – Agency Asian Development Bank (ADB)
Works: Review and update of Detailed Project Report and Environment and Social Impact Assessment (ESIA)
-
Client/ Developer – Vensar Constructions Company
Works – Tender Documents (Civil, HM, EM and TL), Detail Engineering Design, Construction Drawing, Design Review of HM, EM and TL
-
Client/ Developer – Vensar Constructions Company
Works – Tender Documents (Civil, HM, EM and TL), Detail Engineering Design, Construction Drawing, Design Review of HM, EM and TL