We provide a full suite of services for hydropower projects, guiding them from the initial concept through to long-term operation. Our expertise begins with comprehensive pre-feasibility and feasibility studies, which include detailed environmental, social, hydrological, and geotechnical investigations to ensure project viability. We then proceed with meticulous detailed engineering design and tender document preparation, translating conceptual plans into buildable blueprints. During the construction phase, we offer expert construction supervision, project management, and owner’s engineer services to ensure quality, safety, and adherence to timelines. Finally, we provide post-construction support with services in operations and maintenance, as well as rehabilitation and upgrading to enhance performance and extend the asset’s lifespan.

Explore Projects

Explore Projects

Project List

  • Five Dams in Dang Valley
  • HP-1 Upper Trishuli – 1 HEP (216 MW)
  • HP-1 Upper Trishuli-I HEP (216 MW)
  • HP-5 Manang Marsyangdi Hydropower Project (144 MW)
  • HP-6 Saptang Khola Small Hydropower Project (2.5 MW)
  • HP-7 Lower Barun Khola Hydropower Project (132 MW)
  • HP-8 Budhi Gandaki HPP (1200 MW)
  • HP-9 Rawa Khola HEP (6.5 MW)
  • HP-10 Upper Marsyangadi-III HEP (121 MW)
  • HP-11 Upper Marsyangadi-II HEP (125 MW)
  • HP-11 Upper Marsyangadi-II HEP, Optimization (250MW)
  • HP-13 Lower Arun HEP (400 MW)
  • HP-14 Upper Modi HEP (14 MW)
  • HP-15 Low Head Kaligandaki HEP (30 MW)
  • HP-16 Talkot Seti HEP (75 MW)
  • HP-17 Deku Khola (3.4 MW)
  • HP-18 Tila HEP (500 MW)
  • HP-19 Chhere Khola (12 MW)
  • HP-20 Phukot Karnali HEP (210 MW)
  • HP-21 Upper Seti Hydropower Project (20 MW)
  • HP-22 Upper Lapche Khola (52 MW)
  • HP-23 Karuwa Hydropower Project (36 MW), Kaski
  • HP-24 Bheri-1 Hydropower Project (270 MW)
  • HP-25 Jawa Khola HPP (17.2 MW)
  • HP-26 Tamakoshi V Hydroelectric Project (99.8 MW)
  • HP-26 Tamakoshi V Hydroelectric Project (99.8 MW)
  • HP-27 Lower Likhu HPP (28.1 MW)
  • HP-28 Upper Jeuligad Small Hydroelectric Project (4 MW)
  • HP-29 Upper Khudi Hydropower project (21.21 MW)
  • HP-30 Sapsup Khola Small Hydropower Project (6.6 MW)
  • HP-31 Budhi Gandaki Nadi HEP (91.17 MW), Gorkha
  • HP-32 Kabeli-3 HEP (21.93 MW), Taplejung
  • HP-33 Lower Tadi Khola HPP (5 MW)
  • HP-34 Likhu-IV Hydroelectric Project (52.4 MW)
  • HP-35 Likhu-A Hydropower Project (24.2 MW)
  • HP-36 Nyadi Hydropower Project (30 MW)
  • HP-37 Chujung Khola Hydropower Project (48 MW)
  • HP-38 Mai Beni Hydropower Project (9.51 MW) and HP-39 Lower Jogmai Khola Hydropower Project (6.2 MW)
  • HP-40 Upper Chamelia HPP (53.85 MW)
  • HP-41 Upper Balephi HPP (46 MW)
  • HP-42 Bhotekoshi HPP (44 MW)
  • HP-43 Buku Khola HEP (6 MW)
  • HP-44 Jum Khola Jalvidhyut Aayojana (56 MW)
  • HP-38 (Mai Beni (9.51 MW), HP-39 Lower Jogami (6.2 MW) and HP-45 Middle Mewa (73.5 MW)
  • HP-46 Irkhuwa Khola B HEP (15 MW)
  • HP-47 Khimti-II HPP (48.8 MW)
  • HP-48 Langtang Khola HPP (20 MW)
  • HP-70 Sankhuwa Khola HEP (41.06 MW)
  • HP-72 Balephi Khola HEP (40 MW)
  • HP-73 Bajhang Upper Seti HPP (216 MW)
  • HP-727 Upper Tamor Hydropower Project (285 MW), Taplejung
  • HP-75 Miwaje Khola HPP (5MW), Kaski
  • HP-79 Tamakoshi-3 HEP (650 MW), Dolkha
  • Client – Mega Dang Valley Irrigation Project

    Works – Feasibility Study, IEE & Detailed Design of 5 Dams :
    D-1 Dam at Vitri Khola – 29 m (Earthen Dam)
    D-2 Dam at Gwar Khola – 125 m (Clay Core Rockfill Dam)
    D-3 Dam at Balim Khola – 70 m (Clay Core Rockfill Dam)
    D-4 Dam at Vutiya Tal/ Tuhi Khola – 15 m (Earthen Dam)
    D-5 Dam at Ranighat Khola – 43 m (Earthen Dam)

  • Client – Nepal Water and Energy Development Company Pvt. Ltd.

    Works – Assistance in Preperation of Detailed Design, Drawings & Cost Estimates

  • Client – Nepal Water and Energy Development Company Pvt. Ltd

    Works – Project investigation, Design and Detailed Feasibility Study. Preparation of EIA, ToR Scoping and EIA report, Survey, Design and Drawing preparation of access road

  • Client – Marsyangdi Power Company P. Ltd.

    Works – Design review, Cost review, financial analysis, preparation of construction schedule, Power and Energy calculation for Peaking RoR, Power Evacuation Study, facilitation of Grid Connection Agreement and Power Purchase Agreement

  • Client – Machhapuchhre Bank Limited

    Works – Prepare Due Diligence Study Report, review and independent analysis of hydrology and geological study, review and independent assessment of installed capacity and energy generation, review and independent analysis of transmission plan, review of design parameters and criteria, verification of cost estimates, financial analysis

  • Client – Ampik Energy Pvt. Ltd.

    Works – Geotechnical investigation that includes 265 m of core drilling and associated laboratory tests.

  • Client – Budhigandaki Hydropower Development Committee

    Works – Feasibility study, Detailed Design Report & Tender documents preparation and EIA Studies

  • Client – Dudh Koshi Power Company Pvt. Ltd.

    Works – Detailed Engineering Design & Tender Documents Preparation

  • Client – VA TECH Hydro, Switzerland

    Works – Investigation, Detailed Feasibility Study of the project, which includes Topographical survey, Geological mapping & investigation, Hydrological analysis EIA study etc.

  • Client – Himtal Hydropower Co. Pvt. Ltd

    Works – Investigation, Design and Detailed Feasibility Study.

  • Client – Himtal Hydropower Co. Pvt. Ltd

    Works – Investigation of optimal plant capacity. Detail analysis of the project alternatives. Preparation of optimization study report.

  • Client – Bras Power International, Brazil

    Works – Hydrological gauging station establishment, Land Acquisition, Survey, Design and Drawing preparation for approximately 26 km long access road

  • Client – GITEC Nepal Pvt. Ltd

    Works – Upgrading and Detailed Feasibility Report and ACRP Report.

  • Client – Jade Power Pvt. Ltd.

    Works – Inventory study & Preparation of Desk Study report

  • Client – H20 Hydropower

    Works – Inventory study & Preparation of Desk Study report

  • Client – GCE Group Pvt. Ltd.

    Works – Inventory study & Preparation of Desk Study report

  • Client – Tila Hydropower

    Works – Inventory study & Preparation of Desk Study report

  • Client – Jade Power Pvt. Ltd.

    Works – Inventory study & Preparation of Desk Study report

  • Client – PES Engineers Pvt. Ltd.

    Works – Preparation of Desk Study report

  • Client – Upper Seti Hydropower Pvt. Ltd.

    Works – Feasibility Study including Field Investigation (Hydrological & Sedimentological Study, Geological Mapping, Topographical Survey)

  • Client – Energy Venture Pvt. Ltd.

    Works – Review of Feasibility Study & Detail Project Report. Detail Engineering Design with reinforcement drawing. Preparation of Tender Documents

  • Client – Jhaymolonga Hydropower Company P. Ltd

    Works – Detail design of all project structures including 3.5 km HRT, preparation of tender documents, survey and design of access road and transmission line, hydrological and sedimentological studies, geological mapping.

  • Client – Gezhouba Group Power Investment Nepal Pvt. Ltd.

    Works – Review of Feasibility Study

  • Client – Department of Electricity Development

    Works – Feasibility Study and IEE Study

  • Client – Tamakoshi Jalvidyut Company Limited
    Funded by Asian Infrastructure Investment Bank

    Works – Restructure Environmental Management Action Plan (EMAP), prepare Stakeholder Engagement Plan, prepare Monitoring Plan, conduct Cumulative Impacts Assessment, Climate Change Assessment, develop Pollution control strategy, develop Public Health and Safety Strategy, develop Local employment strategy, prepare Land acquisition and Livelihood Restoration Plan, Environmental Flows and Ecosystem Services Assessment, develop E&S actions to be implemented by the Developer, develop E&S specifications for the EPC contractor. Preparation of Supplemental Environmental and Social Documentation (SESD)

  • Client – Tamakoshi Jalvidyut Company Limited

    Funding Agency – Asian Infrastructure Investment Bank
    Works – To conduct and prepare Critical Habitat Assessment, Consultation and Partnership Building Strategy, Mitigation Strategies and Biodiversity Action Plan (BAP)

  • Client – Consortium led by Laxmi Bank

    Works – Due Diligence Study for Cost Overrun

  • Client – Woonsun Energy & Construction Co. Ltd., Seoul, Korea

    Works – Feasibility study

  • Client – Bank of Kathmandu

    Works – Due Diligence Study.

  • Client – Himalayan Bank Ltd.

    Works – Technical Bill Verification and Progress monitoring

  • Client – Surya Energy

    Works – Detail Feasibility including field investigation (hydrological and sedimentological study, geological mapping, topographical survey) & EIA

  • Client – Kabeli HP Dev. Co. P Ltd

    Works – Detail Design of all project structures such as headworks, headrace tunnel, penstock, powerhouse, camp facilities, access road including hydrological & sedimentological studies and geological mapping.

  • Client – Consortium led by Siddhartha Bank

    Works – Technical Consultant for Bill Verification Work & Progress Monitoring

  • Client – Consortium led by Laxmi Bank

    Works – Technical Consultant for Bill Verification Work & Progress Monitoring

  • Client – Consortium led by Laxmi Bank

    Works – Technical Consultant for Bill Verification Work & Progress Monitoring

  • Client – Consortium led by Everest Bank

    Works – Technical Consultant for Bill Verification Work & Progress Monitoring

  • Client – Chujung Khola Hydropower Co. Ltd.

    Works – Detail Feasibility Study including field investigation (Hydrological and sedimentological study, Geological mapping, Topographical survey)

  • Client – Urja Developers Pvt. Ltd

    Works – Social Assessment and Biodiversity Assessment

  • Client – Department of Electricity Development

    Works – Feasibility and Environmental Impact Assessment (EIA) study

  • Client – Laxmi Sunrise Bank Limited

    Works – Due Diligence Study

  • Client – Nepal Infrastructure Bank Limited

    Works – Due Diligence Study

  • Client – Himalayan Bank Limited

    Works – Due Diligence Study

  • Client – Nabil Bank Limited

    Developer – Sanima Jum Hydropower Limited
    Works – Due Diligence Study of the Jum Khola

  • Client – IFC

    Works – Due Diligence study, a high-level technical appraisal of the 3 hydro projects

  • Client – Laxmi Bank Ltd.

    Works – Due Diligence Work

  • Client – Sunrise Bank Ltd

    Works – Due Diligence Study

  • Client – Sunrise Bank Ltd

    Works – Due Diligence Study

  • Client – Citizen Bank International Ltd.

    Works – Due Diligence Study

  • Client – Balephi Energy Pvt. Ltd.

    Works – Due Dilligence Study

  • Client – Kumari Bank Ltd.

    Works – Due Delligence Study

  • Client – Tamor Energy Pvt. Ltd.

    Works – Technical document review of underground works

  • Client – Maa Durga Kali Hydropower Company Pvt. Ltd.

    Works – Detailed Project Report (DPR)

  • Client – T-3 Hydro Company Pvt. Ltd.

    Works – Pre-feasibility Study

Project List