Roads &
Highways

Jade Consult has extensive experience in survey, feasibility study, detailed design and construction supervision of road projects ranging from rural roads to highways in diverse geographical terrain across Nepal, including mountainous, hilly, and Terai regions.

Explore Projects

Explore Projects

Project List

  • RO-1 Feasibility Study of Access Road (12 km) for Upper Marsyangdi-2 HEP, Manang and Lamjung Districts
  • RO-2 Feasibility Study of Acces Road (18.8 km) for Upper Trishuli -1 HEP (216 MW) Excavation Volume : 736,900 m3
  • Ro-3 Detailed Design of Road in Sankhuwasabha District, Nepal
  • RO-4 Detail Design of Access Road (15.3 km) for Upper Trishuli-1 HEP
  • RO-5 Detailed Design of Road in Dolakha District, Nepal
  • RO-6 Detailed Design and Survey of access road (12 km) for Kabeli -3 HEP
  • RO-7 Feasibility Study of Access Road (12.7 km) for Upper Seti Hydropower Project, Kaski District
  • RO-8 Detailed Design of Road in Kaski District, Nepal
  • RO-9 Detail Design of Assess Road (8 km) for Upper Seti Hydropower Project (20 MW)
  • RO-10 Detailed Design and Survey of access road of about 14 km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project, Jumla District
  • RO-11 TA-9461 REG: Protecting & Investing in Natural Capital in Asia & the Pacific – Smart Infrastructure Planning & Design (Nepal)
  • RO-12 Detailed Design of Access Road (29 km) for Simbuwa Khola Hydropower Project
  • RO-13 Feasibility study of Access Road (26 km) for Kaligandaki Storage Hydropower Project
  • RO-14 Consultancy Services for Green and Resilient Strategy for Nepal’s Selected Highway Corridors
  • R)-16 Detailed Design of Road in Rasuwa District, Nepal
  • Client – Himtal Hydropower Co.Ltd.

    Works – Detailed survey, design, quantity and cost estimate, drawings.

  • Client – Nepal Water and Energy Development Company Pvt. Ltd.

    Works – Detailed Survey, Design, Quality and Cost Estimation, Drawings

  • Client – Mountain Hydro Nepal Ltd.

    Road Length: 26 km
    Works – Survey and Design

  • Client- Saman Engineering, Korea

    Works- Detail Design: Review of Basic Design which includes aligment study, standards and specifications, conduct engineering design of the permanent road and other facilities, carry out hydrological studies and cross drainage works, preparation of engineering drawings and reports, including necessary calculations and specifications, preparation of quantity estimation, recommendations for construction materials and disposal site

  • Client – Mountain Hydro Nepal Ltd.

    Road Length: 32 km
    Works – Detailed Designing

  • Client – Kabeli Hydropower Development. Co. P. Ltd.

    Works – Detailed survey, preparation of detailed engineering design, quantity and cost estimate, drawings.

  • Client – Upper Seti Hydro Pvt. Ltd.

    Works – Detailed survey, design, quantity and cost estimate, drawings.

  • Client – Mountain Hydro Nepal Ltd.

    Road Length: 10.8 km
    Works – Detailed Designing

  • Client-Department of Roads, Nepal

    Works-Detailed Survey, preparation of detailed engineering design, quantitty and cost estimate, drawings
    Excavation Volume – 203,894 m3

  • Client – Department of Electricity Development

    Works – Detailed survey, preparation of detailed engineering design, quantity and cost estimate, drawings.

  • Client – Asian Development Bank

    Works – To conduct comprehensive and in-depth ecological studies in and around the project area for the Narayanghat-Hetauda-Pathlaiya road and to provide technical support and guidance for design and implementation of the wildlife mitigation measures and biodiversity conservation plan for the Narayanghat-Butwal road under the SASEC Road Improvement Project (SRIP) project as necessary.

  • Client – Remit Hydro Limited

    Works – Detailed survey, preparation of detailed engineering design, quantity and cost estimate, drawings.

  • Client – Department of Electricity Development

    Works – Detailed survey, design, quantity and cost estimate, drawings.

  • Client – World Bank

    Works – Carry out a comprehensive strategic environmental and social assessment of both East West Highway and North South trade corridors and develop a Green and Resilient Strategy for Selected Highway Corridors in Nepal.

  • Client – Mountain Hydro Nepal Ltd.

    Finance – International Finance Corporation (IFC)
    Road Length – 15.3 km
    Works – Detailed Designing

Project List