RO-1 Feasibility Study of Access Road (12 km) for Upper Marsyangdi-2 HEP, Manang and Lamjung Districts
Client – Himtal Hydropower Co.Ltd.
Works – Detailed survey, design, quantity and cost estimate, drawings.
-
RO-2 Feasibility Study of Acces Road (18.8 km) for Upper Trishuli -1 HEP (216 MW) Excavation Volume : 736,900 m3
Client – Nepal Water and Energy Development Company Pvt. Ltd.
Works – Detailed Survey, Design, Quality and Cost Estimation, Drawings
-
Ro-3 Detailed Design of Road in Sankhuwasabha District, Nepal
Road Length: 26 km
Works – Survey and Design
-
RO-4 Detail Design of Access Road (15.3 km) for Upper Trishuli-1 HEP
Client- Saman Engineering, Korea
Works- Detail Design: Review of Basic Design which includes aligment study, standards and specifications, conduct engineering design of the permanent road and other facilities, carry out hydrological studies and cross drainage works, preparation of engineering drawings and reports, including necessary calculations and specifications, preparation of quantity estimation, recommendations for construction materials and disposal site
-
RO-5 Detailed Design of Road in Dolakha District, Nepal
Road Length: 32 km
Works – Detailed Designing
-
RO-6 Detailed Design and Survey of access road (12 km) for Kabeli -3 HEP
Client – Kabeli Hydropower Development. Co. P. Ltd.
Works – Detailed survey, preparation of detailed engineering design, quantity and cost estimate, drawings.
-
RO-7 Feasibility Study of Access Road (12.7 km) for Upper Seti Hydropower Project, Kaski District
Client – Upper Seti Hydro Pvt. Ltd.
Works – Detailed survey, design, quantity and cost estimate, drawings.
-
RO-8 Detailed Design of Road in Kaski District, Nepal
Road Length: 10.8 km
Works – Detailed Designing
-
RO-9 Detail Design of Assess Road (8 km) for Upper Seti Hydropower Project (20 MW)
Client-Department of Roads, Nepal
Works-Detailed Survey, preparation of detailed engineering design, quantitty and cost estimate, drawings
Excavation Volume – 203,894 m3
-
RO-10 Detailed Design and Survey of access road of about 14 km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project, Jumla District
Client – Department of Electricity Development
Works – Detailed survey, preparation of detailed engineering design, quantity and cost estimate, drawings.
-
RO-11 TA-9461 REG: Protecting & Investing in Natural Capital in Asia & the Pacific – Smart Infrastructure Planning & Design (Nepal)
Client – Asian Development Bank
Works – To conduct comprehensive and in-depth ecological studies in and around the project area for the Narayanghat-Hetauda-Pathlaiya road and to provide technical support and guidance for design and implementation of the wildlife mitigation measures and biodiversity conservation plan for the Narayanghat-Butwal road under the SASEC Road Improvement Project (SRIP) project as necessary.
-
RO-12 Detailed Design of Access Road (29 km) for Simbuwa Khola Hydropower Project
Client – Remit Hydro Limited
Works – Detailed survey, preparation of detailed engineering design, quantity and cost estimate, drawings.
-
RO-13 Feasibility study of Access Road (26 km) for Kaligandaki Storage Hydropower Project
Client – Department of Electricity Development
Works – Detailed survey, design, quantity and cost estimate, drawings.
-
RO-14 Consultancy Services for Green and Resilient Strategy for Nepal’s Selected Highway Corridors
Client – World Bank
Works – Carry out a comprehensive strategic environmental and social assessment of both East West Highway and North South trade corridors and develop a Green and Resilient Strategy for Selected Highway Corridors in Nepal.
-
R)-16 Detailed Design of Road in Rasuwa District, Nepal
Finance – International Finance Corporation (IFC)
Road Length – 15.3 km
Works – Detailed Designing