Jade Consult has been involved in the survey, feasibility study, detailed design, and construction supervision of several roads ranging from rural roads to highways in a diverse geographical terrain such as mountainous, hilly and terai region of Nepal.

Completed Projects
  1.  Detailed Design and Survey of access road of about 14 Km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project (15.25 MW)
  2.  Feasibility Study of Access Road (12.7 Km) for Upper Seti Hydropower Project (20 MW)
  3.  Detailed Design of Access Road (10.8 Km) for Karuwa Seti Hydropower Project (32 MW)
  4.  Detailed Design of Access Road (36 Km) for Upper Lapche Khola Hydropower Project (52 MW)
  5.  Detail Design of Access Road (15.3 km) for 216 MW Upper Trishuli-I Hydroelectric Project
  6.  Survey and Detail Design of 26 Km Access Road for Lower Arun Hydroelectric Project (400 MW)
  7.  Feasibility Study of Access Road (18.8 Km) for Upper Trisuli – 1 HEP (216 MW)
  8.  Feasibility Study of Access Road (12 Km) for Upper Marsyangdi-2 HEP (125 MW)
Ongoing Projects
  1. Consulting Service for Green and Resilient Strategy for Nepal’s Selected Highway Corridors
  2. TA-9461 REG: Protecting and Investing in Natural Capital in Asia and the Pacific – Smart Infrastructure Planning and Design, Nepal, Narayanghat-Hetauda-Pathlaiya Road Section (106 Km) of the East-West Highway
  3.  Technical, legal, environmental and social advisory services for the construction/upgradation of Narayanghat-Butwal Road (115 Km) from 2 lane to 4 lanes under ADB SASEC Road Improvement Project (SRIP)
  4.  Feasibility study of Access Road (26 Km) for Kaligandaki Storage Hydropower Project (844 MW)
  5.  Detailed Design of Access Road (29 Km) for Simbuwa Khola Hydropower Project (70.34 MW)
  6.  Detailed Design of Access Road (8 Km) for Upper Seti Hydropower Project (20 MW)
  7.  Detailed Design and Survey of access road (12 Km) for Kabeli -3 HEP (21.93 MW)
  8.  Construction Supervision of Access Road (15.3km) for 216 MW Upper Trishuli-I Hydroelectric Project
S. No. Job Details Length Location Client Completion Date Involvement
1.        TA-9461 REG: Protecting and Investing in Natural Capital in Asia and the Pacific – Smart Infrastructure Planning and Design, Nepal, Narayanghat-Hetauda-Pathlaiya Road Section (106 Km) of the East-West Highway 106 Km Chitwan, Makwanpur, Bara, Parsa Districts Asian Development Bank Ongoing Associate Partner
2.        Technical, legal, environmental and social advisory services for the construction/upgradation of Narayanghat-Butwal Road (115 Km) from 2 lane to 4 lanes under ADB SASEC Road Improvement Project (SRIP) 115 Km Chitwan, Nawalparasi, Rupandehi Districts GCE Group Pvt. Ltd. Ongoing Sub-consultant
3.        Feasibility study of Access Road (26 Km) for Kaligandaki Storage Hydropower Project (844 MW) 26 Km Parbat, Myagdi District Department of Electricity Development Ongoing JV partner
4.        Detailed Design of Access Road (29 Km) for Simbuwa Khola Hydropower Project (70.34 MW) Excavation Volume: 1,419,500 m3 29 Km Taplejung District Remit Hydro Limited, Kathmandu, Nepal Ongoing JV partner
5.        Detailed Design of Access Road (8 Km) for Upper Seti Hydropower Project (20 MW) Excavation Volume: 203,894 m3 8 Km Kaski District Upper Seti Hydro Pvt. Ltd., Kathmandu, Nepal Ongoing Sole
6.        Detailed Design and Survey of access road (12 Km) for Kabeli -3 HEP (21.93 MW) Excavation Volume: 101,700 m3 12 km Taplejung District Kabeli Hydropower Development. Co. P. Ltd. Ongoing Sole
7.        Construction Supervision of Access Road (15.3km) for 216 MW Upper Trishuli-I Hydroelectric Project. Excavation Volume: 845,700 m3 15.3 km Rasuwa District Nepal Water and Energy Development Company Pvt. Ltd. (NWEDC), Kathmandu, Nepal Ongoing Sole
8.        Detailed Design and Survey of access road of about 14 Km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project (15.25 MW) Excavation Volume: 78,200 m3 14 Km Jumla District Department of Electricity Development April 2019 Sole
9.        Feasibility Study of Access Road (12.7 Km) for Upper Seti Hydropower Project (20 MW) 12.7 Km Kaski District Upper Seti Hydro Pvt. Ltd., Kathmandu, Nepal April 2018 Sole
10. Detailed Design of Access Road (10.8 Km) for Karuwa Seti Hydropower Project (32 MW) Excavation Volume: 180,000 m3 10.8 Km Kaski district Jhyamolongma Hydropower Development Company (P) Ltd., Kathmandu, Nepal July 2018 Sole
11. Detailed Design of Access Road (36 Km) for Upper Lapche Khola Hydropower Project (52 MW) Excavation Volume: 210,100 m3 Elevation: up to 3700 m above sea level 36 Km Dolakha District Energy Venture Pvt. Ltd., Kathmandu, Nepal July 2017 Sole
12. Detail Design of Access Road (15.3 km) for 216 MW Upper Trishuli-I Hydroelectric Project. Excavation Volume: 726,500 m3 15.3 km Rasuwa District Saman Engineering, Korea April 2014 Sole
13. Survey and Detail Design of 26 Km Access Road for Lower Arun Hydroelectric Project (400 MW) 26 Km Sankhuwasabha District Braspower International Engineering, Brazil Sep 2013 Sole
14. Feasibility Study of Access Road (18.8 Km) for Upper Trisuli – 1 HEP (216 MW) Excavation Volume: 736,900 m3 18.8 Km Rasuwa District Nepal Water and Energy Development Company Pvt. Ltd., Kathmandu, Nepal Jan 2012 Sole
15. Feasibility Study of Access Road (12 Km) for Upper Marsyangdi-2 HEP (125 MW)   12 km Manang & Lamjung Districts Himtal Hydropower Co.Ltd. Jan 2008 Sole