ES-1 Upper Marshyangdi – 2 HEP (125 MW)
Client – Himtal Hydropower Company P. Ltd.
Funding agency – ADB
Works – Preparation of scoping document and TOR for Environmental Impact Assessment (EIA) Study.
-
ES-2 Upper Trishuli-1 HEP (216 MW)
Client – Nepal Water and Energy Development Company Pvt. Ltd
Funding agency – ADB
Works – Initial Environment Examination (IEE) Study, Base Line Study, Scoping and TOR documents for EIA, Environment Management Action Plan
-
ES-3 Budhi Gandaki Hydroelectric Project (1200 MW)
Client – Budhigandaki Hydropower Development Committee
Funding agency – ADB
Works – Environmental and Social Impact Assessment (ESIA) Studies
-
ES-5 Transmission Line of 220 kV for 216 MW Upper Trishuli – 1 HEP
Client – Nepal Water and Energy Development Company Pvt. Ltd
Funding agency – ADB
Works – Initial Environment Examination (IEE) Study
-
ES-6 Jawa Khola HPP (15.25 MW)
Client – Department of Electricity Development
Funding agency – ADB
Works – Initial Environment Examination (IEE) Study
-
ES-8 33 kV Transmission line for Arun -3 HPP (900 MW)
Client – SJVN Arun-3 HPP Power Development Company (SAPDC)
Funding agency – ADB
Works – Initial Environment Examination (IEE) Study and approval from GoN
-
ES-9 SASEC (South Asian Sub Regional Economic Cooperation) Power System Expansion Project (Total Project Cost: USD 440.5 Million)
Client – Asian Development Bank (Implementing Agency-NEA)
Funding agency – ADB
Works – Site inspection to monitor compliances (Environmental and Social), Review/update Environmental, Health Safety Plan, Prepare/review of Periodic Safeguard Monitoring Report (monthly, quarterly, semi-annual), Preparation of updated Resettlement and Indigenous Peoples’ Plan
-
ES-10 Nepal Portion of ( Diding- Dhalkebar- Indo Nepal border ast Bathana) of 400 kV Double Circuit Diding Nepal – Muzzafarpur India Transmission Line system for evacuation of power from Arun-3 HPP (210 km)
Client – SJVN Arun-3 HPP Power Development Company (SAPDC)
Funding agency – ADB
Works – Identification of land ownership detail, Social and Environmental Survey, Preparation of Supplementary Initial Environmental Examination of Changed Portion, Preparation of Resettlement Action Plan for the affected seven districts. Resettlement and Rehabilitation (R & R) Plan
-
ES-11 Reconstruction and Improvement of Electricity in Earthquake Affected Districts of Rasuwa and Nuwakot
Client – Nepal Electricity Authority
Funding Agency – KfW and EIB
Works – Bidding Document of Social Infrastructure Development Component, Environmental and Social Impact Assessment of transmission line (33 kV) and substation (33/11 kV), Environmental Impact Assessment of 33 kV TL and associated substation 33/11 kV
-
ES-13 Phukot-Betan 400 kV Double Circuit Transmission Line Project
Client – Rastriya Prasaran Grid Company Limited, Nepal
Funding agency – ADB
Works – IEE study of the Transmission Line as well as the Substation area and approval from GoN, Tree Cutting Plan, Cadastral Survey, SIA, Preparation and approval of Forest Clearance
-
ES-14 Betan-Dododhara 400 kV Double Circuit Transmission Line Project
Client – Rastriya Prasaran Grid Company Limited, Nepal
Funding agency – ADB
Works – IEE study of the Transmission Line as well as the Substation area and approval from GoN, Tree Cutting Plan, Cadastral Survey, SIA, Preparation and approval of Forest Clearance
-
ES-15 Dododhara-Karmadev 400 kV Double Circuit Transmission Line Project
Client – Rastriya Prasaran Grid Company Limited, Nepal
Funding agency – ADB
Works – IEE study of the Transmission Line as well as the Substation area and approval from GoN, Tree Cutting Plan, Cadastral Survey, SIA, Preparation and approval of Forest Clearance
-
ES-16 Consultancy Services for Green and Resilient Strategy for Nepal’s Selected Highway Corridors
Client – World Bank
Funding agency – ADB
Works – Carry out a comprehensive strategic environmental and social assessment of both East West Highway and North South trade corridors and develop a Green and Resilient Strategy for Selected Highway Corridors in Nepal
-
ES-17 TA-9461 REG: Protecting and Investing in Natural Capital in Asia and the Pacific – Smart Infrastructure Planning and Design (Nepal)
Client – Asian Development Bank
Funding agency – ADB
Works – To conduct comprehensive and in-depth ecological studies in and around the project area for the Narayanghat-Hetauda-Pathlaiya road and to provide technical support and guidance for design and implementation of the wildlife mitigation measures and biodiversity conservation plan for the Narayanghat-Butwal road under the SASEC Road Improvement Project (SRIP) project as necessary.
-
ES-20 Damauli – Kusma – Burtibang – Bafikot 400 kV Transmission Line and Associated Substations
ES-20 Damauli – Kusma – Burtibang – Bafikot 400 kV Transmission Line and Associated Substations
Funding Agency – ADB
Works – Environmental and Social Study (Initial Environmental Examination, Social Impact Assessment, Resettlement and Indigenous Peoples’ Plan, Environmental Management Plan, Tree Cutting Plan)
-
ES-21 Budhigandaki Corridor (Philim-Gumda-Ratamate) 400 kV Transmission Line and 132 kV Dailekh-Kalikot-Jumla and Lamoshangu-Kavre/Ramechhap Transmission Line and Associated Substations
Client – Nepal Electricity Authority
Funding Agency – ADB
Works -Environmental and Social Study (Initial Environmental Examination, Social Impact Assessment, Resettlement and Indigenous Peoples’ Plan, Environmental Management Plan, Tree Cutting Plan)
-
ES-22 Upper Chameliya Hydropower Project (60 MW), Darchula District
ES-22 Upper Chameliya Hydropower Project (60 MW), Darchula District
Funding agency – ADB
Works – Feasibility and Environmental Impact Assessment (EIA) study
-
ES-23 Preparation of Biodiversity Action Plan (BAP) for Tamakoshi Hydroelectric Project (99.8 MW)
ES-23 Preparation of Biodiversity Action Plan (BAP) for Tamakoshi Hydroelectric Project (99.8 MW)
Funding Agency – Asian Infrastructure Investment Bank
Works – To conduct and prepare Critical Habitat Assessment, Consultation and Partnership Building Strategy, Mitigation Strategies and Biodiversity Action Plan
-
ES-24 Preparation of Supplemental Environmental and Social Documentation (SESD) for Tamakoshi V HEP (99.8 MW)
ES-24 Preparation of Supplemental Environmental and Social Documentation (SESD) for Tamakoshi V HEP (99.8 MW)
Funding Agency – Asian Infrastructure Investment Bank
Works – Restructure Environmental Management Action Plan (EMAP), prepare Stakeholder Engagement Plan, prepare Monitoring Plan, conduct Cumulative Impacts Assessment, Climate Change Assessment, develop Pollution control strategy, develop Public Health and Safety Strategy, develop Local employment strategy, prepare Land acquisition and Livelihood Restoration Plan, Environmental Flows and Ecosystem Services Assessment, develop E&S actions to be implemented by the Developer, develop E&S specifications for the EPC contractor.
-
ES-26 Construction of the 132/11 kV Birauta Substation and 600 m underground cable line in Kaligandaki-Pokhara (Lekhnath) 132 kV Transmission Line Project
Client – NEA
Funding Agency – NEWJEC Inc, Japan JICA
Works – Environmental and social assessment for the construction of 132/11 kV Birauta S/S including underground transmission line, Preparation of IEE report including RAP
-
ES-27 Bathymetric and Topographic Survey of Rara Lake
Client – Department of Hydrology and Meteorology (DHM)
Funding agency – ADB
Works – The main objectives of this assignment are to carry out a detailed investigation of Rara Lake including its bathymetric survey, topographical survey, hydrological studies, sediment studies and water quality studies
-
ES-28 Consulting Services for Detailed Survey and updated Line Design for 30 km of Changes in 400 kV Transmission Line Route Alignment
ES-28 Consulting Services for Detailed Survey and updated Line Design for 30 km of Changes in 400 kV Transmission Line Route Alignment
Funding agency – ADB
Works – Detailed Environmental and Social Assessment including flood risk assessment.
-
ES-30 Upper Karnali Hydropower Project (HPP), Nepal
Client – EDF/GMR
Funding agency – ADB
Works – E&S Baseline Data Collection, Downstream Impact Assessment and E-flow Assessment Study, Rapid Cumulative Impact Assessment (CIA) for Collection of environmental and social baseline data, on Karnali River
-
ES-31 Mai Beni Hydropower Project (9.51 MW) and Lower Jogmai Khola Hydropower Project (6.2 MW)
Client – Urja Developers Pvt. Ltd
Funding agency – ADB
Works – Social Assessment and Biodiversity Assessment
-
ES-32 Lower Jogmai Khola Hydropower Project (6.2 MW)
Client – Urja Developers Pvt. Ltd
Funding agency – ADB
Client – Urja Developers Pvt. Ltd
-
ES-35 Mewa Khola Hydropower Project 23 MW
Client – Union Mewa Hydro Limited
Funding agency – ADB
Works – Initial Environment Examination (IEE)
-
ES-42 Tingla Hub – Likhu Hub – New Khimti – Sunkoshi Hub – Dhalkebar 400 kV Transmission Line and Associated Substations
ES-42 Tingla Hub – Likhu Hub – New Khimti – Sunkoshi Hub – Dhalkebar 400 kV Transmission Line and Associated Substations
Funding Agency – ADB
Works – Environmental and Social Study (Initial Environmental Examination, Social Impact Assessment, Resettlement and Indigenous Peoples’ Plan, Environmental Management Plan, Tree Cutting Plan)