-
Five Dams in Dang Valley
Client – Mega Dang Valley Irrigation Project
Works – Feasibility Study, IEE & Detailed Design of 5 Dams :
D-1 Dam at Vitri Khola – 29 m (Earthen Dam)
D-2 Dam at Gwar Khola – 125 m (Clay Core Rockfill Dam)
D-3 Dam at Balim Khola – 70 m (Clay Core Rockfill Dam)
D-4 Dam at Vutiya Tal/ Tuhi Khola – 15 m (Earthen Dam)
D-5 Dam at Ranighat Khola – 43 m (Earthen Dam)
-
HP-1 Upper Trishuli – 1 HEP (216 MW)
Client – Nepal Water and Energy Development Company Pvt. Ltd.
Works – Assistance in Preperation of Detailed Design, Drawings & Cost Estimates
-
HP-1 Upper Trishuli-I HEP (216 MW)
Client – Nepal Water and Energy Development Company Pvt. Ltd
Works – Project investigation, Design and Detailed Feasibility Study. Preparation of EIA, ToR Scoping and EIA report, Survey, Design and Drawing preparation of access road
-
HP-5 Manang Marsyangdi Hydropower Project (144 MW)
Client – Marsyangdi Power Company P. Ltd.
Works – Design review, Cost review, financial analysis, preparation of construction schedule, Power and Energy calculation for Peaking RoR, Power Evacuation Study, facilitation of Grid Connection Agreement and Power Purchase Agreement
-
HP-6 Saptang Khola Small Hydropower Project (2.5 MW)
Client – Machhapuchhre Bank Limited
Works – Prepare Due Diligence Study Report, review and independent analysis of hydrology and geological study, review and independent assessment of installed capacity and energy generation, review and independent analysis of transmission plan, review of design parameters and criteria, verification of cost estimates, financial analysis
-
HP-7 Lower Barun Khola Hydropower Project (132 MW)
Client – Ampik Energy Pvt. Ltd.
Works – Geotechnical investigation that includes 265 m of core drilling and associated laboratory tests.
-
HP-8 Budhi Gandaki HPP (1200 MW)
Client – Budhigandaki Hydropower Development Committee
Works – Feasibility study, Detailed Design Report & Tender documents preparation and EIA Studies
-
HP-9 Rawa Khola HEP (6.5 MW)
Client – Dudh Koshi Power Company Pvt. Ltd.
Works – Detailed Engineering Design & Tender Documents Preparation
-
HP-10 Upper Marsyangadi-III HEP (121 MW)
Client – VA TECH Hydro, Switzerland
Works – Investigation, Detailed Feasibility Study of the project, which includes Topographical survey, Geological mapping & investigation, Hydrological analysis EIA study etc.
-
HP-11 Upper Marsyangadi-II HEP (125 MW)
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation, Design and Detailed Feasibility Study.
-
HP-11 Upper Marsyangadi-II HEP, Optimization (250MW)
Client – Himtal Hydropower Co. Pvt. Ltd
Works – Investigation of optimal plant capacity. Detail analysis of the project alternatives. Preparation of optimization study report.
-
HP-13 Lower Arun HEP (400 MW)
Client – Bras Power International, Brazil
Works – Hydrological gauging station establishment, Land Acquisition, Survey, Design and Drawing preparation for approximately 26 km long access road
-
HP-14 Upper Modi HEP (14 MW)
Client – GITEC Nepal Pvt. Ltd
Works – Upgrading and Detailed Feasibility Report and ACRP Report.
-
HP-15 Low Head Kaligandaki HEP (30 MW)
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
HP-16 Talkot Seti HEP (75 MW)
Client – H20 Hydropower
Works – Inventory study & Preparation of Desk Study report
-
HP-17 Deku Khola (3.4 MW)
Client – GCE Group Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
HP-18 Tila HEP (500 MW)
Client – Tila Hydropower
Works – Inventory study & Preparation of Desk Study report
-
HP-19 Chhere Khola (12 MW)
Client – Jade Power Pvt. Ltd.
Works – Inventory study & Preparation of Desk Study report
-
HP-20 Phukot Karnali HEP (210 MW)
Client – PES Engineers Pvt. Ltd.
Works – Preparation of Desk Study report
-
HP-21 Upper Seti Hydropower Project (20 MW)
Client – Upper Seti Hydropower Pvt. Ltd.
Works – Feasibility Study including Field Investigation (Hydrological & Sedimentological Study, Geological Mapping, Topographical Survey)
-
HP-22 Upper Lapche Khola (52 MW)
Client – Energy Venture Pvt. Ltd.
Works – Review of Feasibility Study & Detail Project Report. Detail Engineering Design with reinforcement drawing. Preparation of Tender Documents
-
HP-23 Karuwa Hydropower Project (36 MW), Kaski
Client – Jhaymolonga Hydropower Company P. Ltd
Works – Detail design of all project structures including 3.5 km HRT, preparation of tender documents, survey and design of access road and transmission line, hydrological and sedimentological studies, geological mapping.
-
HP-24 Bheri-1 Hydropower Project (270 MW)
Client – Gezhouba Group Power Investment Nepal Pvt. Ltd.
Works – Review of Feasibility Study
-
HP-25 Jawa Khola HPP (17.2 MW)
Client – Department of Electricity Development
Works – Feasibility Study and IEE Study
-
HP-26 Tamakoshi V Hydroelectric Project (99.8 MW)
Client – Tamakoshi Jalvidyut Company Limited
(Funded by Asian Infrastructure Investment Bank)
Works – Restructure Environmental Management Action Plan (EMAP), prepare Stakeholder Engagement Plan, prepare Monitoring Plan, conduct Cumulative Impacts Assessment, Climate Change Assessment, develop Pollution control strategy, develop Public Health and Safety Strategy, develop Local employment strategy, prepare Land acquisition and Livelihood Restoration Plan, Environmental Flows and Ecosystem Services Assessment, develop E&S actions to be implemented by the Developer, develop E&S specifications for the EPC contractor. Preparation of Supplemental Environmental and Social Documentation (SESD)
-
HP-26 Tamakoshi V Hydroelectric Project (99.8 MW)
Client – Tamakoshi Jalvidyut Company Limited
Funding Agency – Asian Infrastructure Investment Bank
Works – To conduct and prepare Critical Habitat Assessment, Consultation and Partnership Building Strategy, Mitigation Strategies and Biodiversity Action Plan (BAP)
-
HP-27 Lower Likhu HPP (28.1 MW)
Client – Consortium led by Laxmi Bank
Works – Due Diligence Study for Cost Overrun
-
HP-28 Upper Jeuligad Small Hydroelectric Project (4 MW)
Client – Woonsun Energy & Construction Co. Ltd., Seoul, Korea
Works – Feasibility study
-
HP-29 Upper Khudi Hydropower project (21.21 MW)
Client – Bank of Kathmandu
Works – Due Diligence Study.
-
HP-30 Sapsup Khola Small Hydropower Project (6.6 MW)
Client – Himalayan Bank Ltd.
Works – Technical Bill Verification and Progress monitoring
-
HP-31 Budhi Gandaki Nadi HEP (91.17 MW), Gorkha
Client – Surya Energy
Works – Detail Feasibility including field investigation (hydrological and sedimentological study, geological mapping, topographical survey) & EIA
-
HP-32 Kabeli-3 HEP (21.93 MW), Taplejung
Client – Kabeli HP Dev. Co. P Ltd
Works – Detail Design of all project structures such as headworks, headrace tunnel, penstock, powerhouse, camp facilities, access road including hydrological & sedimentological studies and geological mapping.
-
HP-33 Lower Tadi Khola HPP (5 MW)
Client – Consortium led by Siddhartha Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
HP-34 Likhu-IV Hydroelectric Project (52.4 MW)
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
HP-35 Likhu-A Hydropower Project (24.2 MW)
Client – Consortium led by Laxmi Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
HP-36 Nyadi Hydropower Project (30 MW)
Client – Consortium led by Everest Bank
Works – Technical Consultant for Bill Verification Work & Progress Monitoring
-
HP-37 Chujung Khola Hydropower Project (48 MW)
Client – Chujung Khola Hydropower Co. Ltd.
Works – Detail Feasibility Study including field investigation (Hydrological and sedimentological study, Geological mapping, Topographical survey)
-
HP-38 Mai Beni Hydropower Project (9.51 MW) and HP-39 Lower Jogmai Khola Hydropower Project (6.2 MW)
Client – Urja Developers Pvt. Ltd
Works – Social Assessment and Biodiversity Assessment
-
HP-40 Upper Chamelia HPP (53.85 MW)
Client – Department of Electricity Development
Works – Feasibility and Environmental Impact Assessment (EIA) study
-
HP-41 Upper Balephi HPP (46 MW)
Client – Laxmi Sunrise Bank Limited
Works – Due Diligence Study
-
HP-42 Bhotekoshi HPP (44 MW)
Client – Nepal Infrastructure Bank Limited
Works – Due Diligence Study
-
HP-43 Buku Khola HEP (6 MW)
Client – Himalayan Bank Limited
Works – Due Diligence Study
-
HP-44 Jum Khola Jalvidhyut Aayojana (56 MW)
Client – Nabil Bank Limited
Developer – Sanima Jum Hydropower Limited
Works – Due Diligence Study of the Jum Khola
-
HP-38 (Mai Beni (9.51 MW), HP-39 Lower Jogami (6.2 MW) and HP-45 Middle Mewa (73.5 MW)
Client – IFC
Works – Due Diligence study, a high-level technical appraisal of the 3 hydro projects
-
HP-46 Irkhuwa Khola B HEP (15 MW)
Client – Laxmi Bank Ltd.
Works – Due Diligence Work
-
HP-47 Khimti-II HPP (48.8 MW)
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
HP-48 Langtang Khola HPP (20 MW)
Client – Sunrise Bank Ltd
Works – Due Diligence Study
-
HP-70 Sankhuwa Khola HEP (41.06 MW)
Client – Citizen Bank International Ltd.
Works – Due Diligence Study
-
HP-72 Balephi Khola HEP (40 MW)
Client – Balephi Energy Pvt. Ltd.
Works – Due Dilligence Study
-
HP-73 Bajhang Upper Seti HPP (216 MW)
Client – Kumari Bank Ltd.
Works – Due Delligence Study
-
HP-727 Upper Tamor Hydropower Project (285 MW), Taplejung
Client – Tamor Energy Pvt. Ltd.
Works – Technical document review of underground works
-
HP-75 Miwaje Khola HPP (5MW), Kaski
Client – Maa Durga Kali Hydropower Company Pvt. Ltd.
Works – Detailed Project Report (DPR)
-
HP-79 Tamakoshi-3 HEP (650 MW), Dolkha
Client – T-3 Hydro Company Pvt. Ltd.
Works – Pre-feasibility Study