Hydropower
& Dams
Proposed headworks location
The Upper Lapche Khola Hydropower Project is a 52 MW run-of-river (RoR) project located in Dolakha District. Electricity generated will be evacuated to the Singati Substation, approximately 36 km from the powerhouse. As a medium-sized project, it contributes significantly to Nepal’s goal of becoming load-shedding free. Jade was responsible for preparing the project’s Detailed Design Report and Tender Documents.
Client : Energy Venture Pvt. Ltd.
Scope of Works : Review of Feasibility Study and detail project report, Detail Engineering Design with reinforcement drawing, Preparation of Tender Documents
General : Project Location: Dolakha District, Lamabagar VDC Nearest highway: Kathmandu-Charikot