Environment
& Social Studies

Karmadev (Indo-Nepal Border)-Phukot (Kalikot)

400 KV Double Circuit Karnali Corridor Tl & Associated Substations

Plantation Area by the project

The Karmadev (Indo-Nepal Border) – Phukot (Kalikot) 400 kV Double Circuit Karnali Corridor Transmission Line and associated Substations Project is designed to evacuate power generated in the Karnali River Basin. The line originates from the Phukot Substation in Kalikot District, passes through the Betan Substation in Surkhet District and the Dododhara Substation in Kailali District, and terminates at Karmadev, where a cross-border connection with India is proposed. This transmission line will play a crucial role in integrating Karnali Basin hydropower into the national grid and facilitating power export through the Indo-Nepal border.

Client :Rastriya Prasaran Grid Company Limited

(funded by – Nepal Govt.)

Scope of Works :- Preparation of Initial Environmental Examination of all TL sections as per National Legislation, Preparation of Social Impact Assessment of all transmission sections as per ADB Requirement, Preparation of Tree Cutting Plan of all transmission sections

Project Features : Voltage Level for all sections: 400 kV, Right of Way of Transmission Line: 46 m (23 m right and 23 m left from center line), TL Section 1: Phukot-Betan 400 kV TL and associated Substation Project Length: 53.73 km, Affected Districts: 2 (Kalikot and Surkhet), SS to be constructedt: Phukot Substation, TL Section 2: Name: Betan-Dododhara 400 kV Transmission Line and associated SS Project, Length: 36.71 km, Affected Districts: 2 (Surkhet and Kailali), SS to be constructed: Betan Substation, TL Section 3: Dododhara-Karmadev 400 kV Transmission Line and associated Substation Project, Length: 29.6 km, Affected Districts: 1(Kailali), SS to be constructed under this project: Dododhara SS

Public hearing at Simal Khet, Ward No. 03 of Chaukune RM

Public hearing at Ward no. 04 of Turmakhad RM

see more environmental & social studies project

  • Reconstruction And Improvement Of Electricity In Earthquake Affected Districts Of Rasuwa And Nuwakot (Rieeadrn) (5KM)
    View Project
  • Construction Of 132 KV Birauta Substation And 600 M Underground Cable Line In Kaligandki-Pokhara (Lekhnath) 132 KV TL Project
    View Project
  • Karmadev (Indo-Nepal Border)-Phukot (Kalikot)
    View Project
  • Budhigandaki Corridor
    View Project
  • Damauli-Kushma-Bafikot
    View Project
  • Tingla Hub-Likhu Hub-New Khimti-Sunkoshi Hub-Dhalkebar
    View Project
  • Simbuwa Khola Hydroelectric Project (Skhep)
    View Project
  • Kaligandaki Storage Hydropower Project (Kgshpp)
    View Project
  • Upper Chameliya Hydropower Project (Uchpp)
    View Project
  • Budhi Gandaki Hydroelectric Project (Bghpp)
    View Project
  • Lower Kopili Hydroelectric Project
    View Project
  • Mugu Karnali Storage Hydro Electric Project
    View Project