Celebrating 23 Years of Professional Services!                                                                               Download Brochure

Owner’s Engineer and Supervision Services for 216 MW Upper Trishuli – I Hydroelectric Project

Review EPC Contractor’s Design; Site Supervision of Construction Works ; Equipment, Factory Inspections and Testing; Assistance in EPC Contract Administration; Quality Control of Construction Materials; Review and Approval of EPC Construction Design; Checking and Issuance of Operation and Maintenance Manuals; Checking and Approval of Execution and Shop Drawings; Checking and Approval of Contractor’s Interim Payments

Feasibility and Environmental Impact Assessment (EIA) study of Kaligandaki Storage Hydropower Project (844 MW)

The proposed Kaligandaki Storage Hydropower Project lies in western part of Nepal. It will inundate some area of province 4 and province 5, namely the districts: Gulmi, Parbat and Baglung. The project boundary covers the area between latitudes 28֯ 16’ 32” N to 28֯ 09’ 25” N and longitudes 83֯ 42’ 32” E to 83֯