Review EPC Contractor’s Design; Site Supervision of Construction Works ; Equipment, Factory Inspections and Testing; Assistance in EPC Contract Administration; Quality Control of Construction Materials; Review and Approval of EPC Construction Design; Checking and Issuance of Operation and Maintenance Manuals; Checking and Approval of Execution and Shop Drawings; Checking and Approval of Contractor’s Interim Payments
Category: Hydropower Project
Feasibility and Environmental Impact Assessment (EIA) study of Kaligandaki Storage Hydropower Project (844 MW)
The proposed Kaligandaki Storage Hydropower Project lies in western part of Nepal. It will inundate some area of province 4 and province 5, namely the districts: Gulmi, Parbat and Baglung. The project boundary covers the area between latitudes 28֯ 16’ 32” N to 28֯ 09’ 25” N and longitudes 83֯ 42’ 32” E to 83֯
Simbuwa Khola Hydropower Project (70.3 MW)
In order to evacuate the power generated from the Simbuwa Khola Hydro Electric Project (SKHEP), the Consultant will study about the generation facility and its connectivity to the grid for evacuation of the power to proposed Koshi Corridor Transmission Line at Dhunge Sanghu which is about 35.4 km from the proposed switchyard of SKHEP as
Feasibility Study, Detail Design, and ESIA of Budhi Gandaki Hydroelectric Project (1200 MW)
The Budhi Gandaki Hydroelectric Project is a storage type project with installed capacity of 1200 MW (6 units of each 200 MW) with operating rated head of 200m, total storage volume of 4500 million m3 and annual energy generation of 3383 GWh in average year. Budhi Gandaki Hydropower Project is located on the Budhi Gandaki