Owner’s Engineer and Supervision Services for 216 MW Upper Trishuli – I Hydroelectric Project

Review EPC Contractor’s Design; Site Supervision of Construction Works ; Equipment, Factory Inspections and Testing; Assistance in EPC Contract Administration; Quality Control of Construction Materials; Review and Approval of EPC Construction Design; Checking and Issuance of Operation and Maintenance Manuals; Checking and Approval of Execution and Shop Drawings; Checking and Approval of Contractor’s Interim Payments

Contract Management and Related Works for Construction of Sunkoshi Marin Diversion Multipurpose Project

The work involves design review, construction supervision, quality control, project management, construction and contract management. The project aims at producing hydropower and providing irrigation facility in the southern plains of Province 2. The project plan includes construction of barrage across the Sunkoshi River to divert 67 Cumecs water through a 13.1 km concrete lined tunnel

Owner’s Engineer for Hetauda – Dhalkebar – Duhabi 400 kV Transmission Line Project

Hetauda – Dhalkebar – Duhabi 400 kV Transmission Line Project is a 285 km double circuit line project, which also includes three 220 kV substations at Hetauda, Dhalkebar and Inaruwa. This Hetauda – Dhalkebar – Duhabi Transmission Line and substations are part of the proposed Nepal India Electricity Transmission and Trade Project (NIETTP). Further, Dhalkebar

SASEC (South Asian Sub Regional Economic Cooperation) Power System Expansion Project – Project Supervision Consultant

The project consists of following sub projects:  a) 220 kV Kaligandaki Transmission Corridor Subproject  b) 220 kV Marsyangdi – Kathmandu Transmission Line Subproject  c) 220 kV Marsayangdi Transmission Corridor Subproject d) Samundratar-Trishuli 3B Hub 132 kV Transmission Line subproject  e) Distribution System Expansion in Eastern, Central and Western Nepal subproject and f) Grid Substation reinforcement

Feasibility and Environmental Impact Assessment (EIA) study of Kaligandaki Storage Hydropower Project (844 MW)

The proposed Kaligandaki Storage Hydropower Project lies in western part of Nepal. It will inundate some area of province 4 and province 5, namely the districts: Gulmi, Parbat and Baglung. The project boundary covers the area between latitudes 28֯ 16’ 32” N to 28֯ 09’ 25” N and longitudes 83֯ 42’ 32” E to 83֯

Consulting Services for Implementation Support for Tamakoshi (Khimti) – Kathmandu 220/400 kV Transmission Line Project – Procurement Phase and Implementation Phase

Tamakoshi (Khimti) – Kathmandu 220/400 kV Transmission Line Project is a 90 km double circuit line project, which also includes three 220 kV substations at Khimti, Barhabise & Kathmandu and 132 kV substation at Chagunarayan. This transmission line will runs between the Khimti substation in Ramechhap District and the new Haledi substation in Kathmandu District,

Resettlement & Rehabilitation (R&R) and Resettlement Action Plan for the Diding – Dhalkebar – Indo Nepal International Border of 400 kV D/C Diding (Nepal) – Muzzafarpur (India) Transmission Line system for Evacuation of Power from Arun –3 HPP

Arun-3 Hydropower Project (900 MW) is situated in Sankhuwasabha District. A 400 kV D/C transmission line has been proposed to evacuate the power from the switchyard of the project at Diding to Muzzafarpur Substation in India. Nepal portion of the transmission line length is 210 km and the total 310 km D/C line will connect