Hydropower
& Dams

Upper Lapche Hpp

(52 MW) DOLKHA, BAGMATI, NEPAL

Proposed headworks location

The Upper Lapche Khola Hydropower Project is a 52 MW run-of-river (RoR) project located in Dolakha District. Electricity generated will be evacuated to the Singati Substation, approximately 36 km from the powerhouse. As a medium-sized project, it contributes significantly to Nepal’s goal of becoming load-shedding free. Jade was responsible for preparing the project’s Detailed Design Report and Tender Documents.

Client : Energy Venture Pvt. Ltd.

Scope of Works : Review of Feasibility Study and detail project report, Detail Engineering Design with reinforcement drawing, Preparation of Tender Documents

General : Project Location: Dolakha District, Lamabagar VDC Nearest highway: Kathmandu-Charikot

Discharge Measurement

River confluence

see more hydropower & dams project

  • Simbuwa Khola Hep
    View Project
  • Upper Lapche Hpp
    View Project
  • Budhigandaki Hpp
    View Project
  • Upper Trishuli-I Hep
    View Project
  • Kaligandaki Storage Hydropower Project
    View Project
  • Sunkoshi Marin Diversion Multipurpose Project (SMDMP)
    View Project
  • Lower Kopili Hydroelectric Project
    View Project