Hetauda – Dhalkebar – Duhabi 400 kV Transmission Line Project is a 285 km double circuit line project, which also includes three 220 kV substations at Hetauda, Dhalkebar and Inaruwa. This Hetauda – Dhalkebar – Duhabi Transmission Line and substations are part of the proposed Nepal India Electricity Transmission and Trade Project (NIETTP). Further, Dhalkebar
Category: Transmission Line
SASEC (South Asian Sub Regional Economic Cooperation) Power System Expansion Project – Project Supervision Consultant
The project consists of following sub projects: a) 220 kV Kaligandaki Transmission Corridor Subproject b) 220 kV Marsyangdi – Kathmandu Transmission Line Subproject c) 220 kV Marsayangdi Transmission Corridor Subproject d) Samundratar-Trishuli 3B Hub 132 kV Transmission Line subproject e) Distribution System Expansion in Eastern, Central and Western Nepal subproject and f) Grid Substation reinforcement
Consulting Services for Implementation Support for Tamakoshi (Khimti) – Kathmandu 220/400 kV Transmission Line Project – Procurement Phase and Implementation Phase
Tamakoshi (Khimti) – Kathmandu 220/400 kV Transmission Line Project is a 90 km double circuit line project, which also includes three 220 kV substations at Khimti, Barhabise & Kathmandu and 132 kV substation at Chagunarayan. This transmission line will runs between the Khimti substation in Ramechhap District and the new Haledi substation in Kathmandu District,
Resettlement & Rehabilitation (R&R) and Resettlement Action Plan for the Diding – Dhalkebar – Indo Nepal International Border of 400 kV D/C Diding (Nepal) – Muzzafarpur (India) Transmission Line system for Evacuation of Power from Arun –3 HPP
Arun-3 Hydropower Project (900 MW) is situated in Sankhuwasabha District. A 400 kV D/C transmission line has been proposed to evacuate the power from the switchyard of the project at Diding to Muzzafarpur Substation in India. Nepal portion of the transmission line length is 210 km and the total 310 km D/C line will connect