Tamakoshi (Khimti) – Kathmandu 220/400 kV Transmission Line Project is a 90 km double circuit line project, which also includes three 220 kV substations at Khimti, Barhabise & Kathmandu and 132 kV substation at Chagunarayan. This transmission line will runs between the Khimti substation in Ramechhap District and the new Haledi substation in Kathmandu District, via the new Barhabise substation in Sindhupalchowk District. The associated facilities will include new bays at the Khimti substation, a new substation at Barhabise and a new substation at Haledi. The route alignment passes through hilly/ mountainous terrain and it falls under the snow loading zone. Altitude of Khimti 200 kV Substation is approx. 650 m.
Jade Consult is providing assistance in (i) preparation of technical specification and bidding documents; (ii) support in bidding process; (iii) supervision during construction, testing and commissioning of the project.
Client: Nepal Electricity Authority
Related posts:
Owner’s Engineer for Hetauda – Dhalkebar – Duhabi 400 kV Transmission Line Project
Resettlement & Rehabilitation (R&R) and Resettlement Action Plan for the Diding – Dhalkebar – Indo Nepal International Border of 400 kV D/C Diding (Nepal) – Muzzafarpur (India) Transmission Line system for Evacuation of Power from Arun –3 HPP
Owner’s Engineer and Supervision Services for 216 MW Upper Trishuli – I Hydroelectric Project
SASEC (South Asian Sub Regional Economic Cooperation) Power System Expansion Project – Project Supervision Consultant
Transmission Line
Special Services