Roads and Highways

Jade Consult has been involved in the survey, feasibility study, detailed design, and construction supervision of several roads ranging from rural roads to highways in a diverse geographical terrain such as mountainous, hilly and terai region of Nepal.

Completed Projects
  1. TA-9461 REG: Protecting and Investing in Natural Capital in Asia and the Pacific – Smart Infrastructure Planning and Design, Nepal, Narayanghat-Hetauda-Pathlaiya Road Section (106 Km) of the East-West Highway
  2. Detailed Design and Survey of access road of about 14 Km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project (15.25 MW)
  3.  Feasibility Study of Access Road (12.7 Km) for Upper Seti Hydropower Project (20 MW)
  4.  Detailed Design of Access Road (10.8 Km) for Karuwa Seti Hydropower Project (32 MW)
  5.  Detailed Design of Access Road (36 Km) for Upper Lapche Khola Hydropower Project (52 MW)
  6.  Detail Design of Access Road (15.3 km) for 216 MW Upper Trishuli-I Hydroelectric Project
  7.  Survey and Detail Design of 26 Km Access Road for Lower Arun Hydroelectric Project (400 MW)
  8.  Feasibility Study of Access Road (18.8 Km) for Upper Trisuli – 1 HEP (216 MW)
  9.  Feasibility Study of Access Road (12 Km) for Upper Marsyangdi-2 HEP (125 MW)
Ongoing Projects
  1. Consulting Service for Green and Resilient Strategy for Nepal’s Selected Highway Corridors
  2.  Technical, legal, environmental and social advisory services for the construction/upgradation of Narayanghat-Butwal Road (115 Km) from 2 lane to 4 lanes under ADB SASEC Road Improvement Project (SRIP)
  3.  Feasibility study of Access Road (26 Km) for Kaligandaki Storage Hydropower Project (844 MW)
  4.  Detailed Design of Access Road (29 Km) for Simbuwa Khola Hydropower Project (70.34 MW)
  5.  Detailed Design of Access Road (8 Km) for Upper Seti Hydropower Project (20 MW)
  6.  Detailed Design and Survey of access road (12 Km) for Kabeli -3 HEP (21.93 MW)
  7.  Construction Supervision of Access Road (15.3km) for 216 MW Upper Trishuli-I Hydroelectric Project

Job Details

Length

Location

Client

Completion Date

Involvement

TA-9461 REG: Protecting and Investing in Natural Capital in Asia and the Pacific – Smart Infrastructure Planning and Design, Nepal, Narayanghat-Hetauda-Pathlaiya Road Section (106 Km) of the East-West Highway

106 Km

Chitwan, Makwanpur, Bara, Parsa Districts

Asian Development Bank

July 2022

Associate Partner

Consulting Service for Green and Resilient Strategy for Nepal’s Selected Highway Corridors

1,400 km (approx..)

East West – Mahendra Highway and North South – Koshi Corridor Highway

World Bank Group

September 2021 – Ongoing

Sub-consultant

Technical, legal, environmental and social advisory services for the construction/upgradation of Narayanghat-Butwal Road (115 Km) from 2 lane to 4 lanes under ADB SASEC Road Improvement Project (SRIP)

115 Km

Chitwan, Nawalparasi, Rupandehi Districts

GCE Group Pvt. Ltd.

Ongoing

Sub-consultant

Feasibility study of Access Road (26 Km) for Kaligandaki Storage Hydropower Project (844 MW)

26 Km

Parbat, Myagdi District

Department of Electricity Development

Ongoing

JV partner

Detailed Design of Access Road (29 Km) for Simbuwa Khola Hydropower Project (70.34 MW)

Excavation Volume: 1,419,500 m3

29 Km

Taplejung District

Remit Hydro Limited, Kathmandu, Nepal

Ongoing

JV partner

Detailed Design of Access Road (8 Km) for Upper Seti Hydropower Project (20 MW)

Excavation Volume: 203,894 m3

8 Km

Kaski District

Upper Seti Hydro Pvt. Ltd., Kathmandu, Nepal

Ongoing

Sole

Detailed Design and Survey of access road (12 Km) for Kabeli -3 HEP (21.93 MW)

Excavation Volume: 101,700 m3

12 km

Taplejung District

Kabeli Hydropower Development. Co. P. Ltd.

Ongoing

Sole

Construction Supervision of Access Road (15.3km) for 216 MW Upper Trishuli-I Hydroelectric Project.

Excavation Volume: 845,700 m3

15.3 km

Rasuwa District

Nepal Water and Energy Development Company Pvt. Ltd. (NWEDC), Kathmandu, Nepal

Ongoing

Sole

Detailed Design and Survey of access road of about 14 Km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project (15.25 MW)

Excavation Volume: 78,200 m3

14 Km

Jumla District

Department of Electricity Development

April 2019

Sole

Feasibility Study of Access Road (12.7 Km) for Upper Seti Hydropower Project (20 MW)

12.7 Km

Kaski District

Upper Seti Hydro Pvt. Ltd., Kathmandu, Nepal

April 2018

Sole

Detailed Design of Access Road (10.8 Km) for Karuwa Seti Hydropower Project (32 MW)

Excavation Volume: 180,000 m3

10.8 Km

Kaski district

Jhyamolongma Hydropower Development Company (P) Ltd., Kathmandu, Nepal

July 2018

Sole

Detailed Design of Access Road (36 Km) for Upper Lapche Khola Hydropower Project (52 MW)

Excavation Volume: 210,100 m3

Elevation: up to 3700 m above sea level

36 Km

Dolakha District

Energy Venture Pvt. Ltd., Kathmandu, Nepal

July 2017

Sole

Detail Design of Access Road (15.3 km) for 216 MW Upper Trishuli-I Hydroelectric Project.

Excavation Volume: 726,500 m3

15.3 km

Rasuwa District

Saman Engineering, Korea

April 2014

Sole

Survey and Detail Design of 26 Km Access Road for Lower Arun Hydroelectric Project (400 MW)

26 Km

Sankhuwasabha District

Braspower International Engineering, Brazil

Sep 2013

Sole

Feasibility Study of Access Road (18.8 Km) for Upper Trisuli – 1 HEP (216 MW)

Excavation Volume: 736,900 m3

18.8 Km

Rasuwa District

Nepal Water and Energy Development Company Pvt. Ltd., Kathmandu, Nepal

Jan 2012

Sole

Feasibility Study of Access Road (12 Km) for Upper Marsyangdi-2 HEP (125 MW)

12 km

Manang & Lamjung Districts

Himtal Hydropower Co.Ltd.

Jan 2008

Sole