Roads/Highways

Jade Consult has been involved in the survey, feasibility study, detailed design and construction supervision
of several roads ranging from rural roads to highways in diverse geographical terrain such as mountainous,
hilly and terai region of Nepal.

S. No.Job DetailsLengthLocationClientCompletion DateInvolvement
1.TA-9461 REG: Protecting and Investing in Natural Capital in Asia and the Pacific – Smart Infrastructure Planning and Design, Nepal, Narayanghat-Hetauda-Pathlaiya Road Section (106 Km) of the East-West Highway 106 kmChitwan, Makwanpur,
Bara, Parsa Districts
Asian Development
Bank
OngoingAssociate Partner
2.Technical, legal, environmental and social advisory services for the construction/upgradation of Narayanghat-Butwal Road of the East -West Highway from 2 lane to 4 lanes under ADB SASEC Road Improvement Project (SRIP) (Package-2: Daunne-Butwal Section, 48 Km)48 kmNawalparasi &
Rupandehi Districts
GCE Group Pvt. Ltd.OngoingSub- Consultant
3.Feasibility study of Access Road (26 Km) for Kaligandaki Storage Hydropower Project (844 MW) 26 kmParbat, Myagdi DistrictDepartment
of Electricity
Development
OngoingJV Parner
4.Detailed Design of Access Road (29 Km) for Simbuwa Khola Hydropower Project (70.34 MW)
Excavation Volume: 1,419,500 m3
29 kmTaplejung DistrictRemit Hydro Limited,
Kathmandu, Nepal
OngoingJV Partner
5Detailed Design of Access Road (8 Km) for Upper Seti Hydropower Project (20 MW)
Excavation Volume: 203,894 m3
8 kmKaski DistrictUpper Seti Hydro Pvt.
Ltd., Kathmandu, Nepal
OngoingSole
6.Detailed Design and Survey of access road (12 Km) for Kabeli -3 HEP (21.93 MW)
Excavation Volume: 101,700 m3
12 kmTaplejung DistrictKabeli Hydropower Development. Co.
Pvt. Ltd.
OngoingSole
7.Construction Supervision of Access Road (15.3km) for 216 MW Upper Trishuli-I Hydroelectric Project.
Excavation Volume: 845,700 m3
15.3 kmRasuwa DistrictNepal Water and Energy Development Company Pvt. Ltd. (NWEDC), Kathmandu, NepalOngoingSole
8.Detailed Design and Survey of access road of about 14 Km length from Jumla Khalanga Bazar to proposed headworks site of Jawa Khola Hydropower Project (15.25 MW)
Excavation Volume: 78,200 m3
14 kmJumla DistrictDepartment of Electricity DevelopmentApril 2019Sole
9.Feasibility Study of Access Road (12.7 Km) for Upper Seti Hydropower Project (20 MW)12.7 kmKaski DistrictUpper Seti Hydro Pvt. Ltd., Kathmandu, NepalApril 2018Sole
10.Detailed Design of Access Road (10.8 Km) for Karuwa Seti Hydropower Project (32 MW)
Excavation Volume: 180,000 m3
10.8 kmKaski DistrictJhyamolongma Hydropower Development Company (P) Ltd., Kathmandu, NepalJuly 2018Sole
11.Detailed Design of Access Road (36 Km) for Upper Lapche Khola Hydropower Project (52 MW)
Excavation Volume: 210,100 m3
Elevation: up to 3700 m above sea level
36 kmDolakha DistrictEnergy Venture Pvt. Ltd., Kathmandu, NepalJuly 2017Sole
12.Detail Design of Access Road (15.3 km) for 216 MW Upper Trishuli-I Hydroelectric Project.
Excavation Volume: 726,500 m3
15.3 kmRasuwa DistrictSaman
Engineering, Korea
April 2014Sole
13.Survey and Detail Design of 26 Km Access Road for Lower Arun Hydroelectric Project (400 MW)26 kmSankhuwasabha DistrictBraspower International Engineering, BrazilSept 2013Sole
14.Feasibility Study of Access Road (18.8 Km) for Upper Trisuli – 1 HEP (216 MW)
Excavation Volume: 736,900 m3
18.8 kmRasuwa DistrictNepal Water and Energy Development Company Pvt. Ltd., Kathmandu, NepalJan 2012Sole
15.Feasibility Study of Access Road (12 Km) for Upper Marsyangdi-2 HEP (125 MW) 12 kmManang &
Lamjung Districts
Himtal
Hydropower Co.Ltd.
Jan 2008Sole