Budhigandaki HPP

(1200MW)

Upper Trishuli-I HEP (216MW)

Upper Trishuli- 1 HEP is located in Rasuwa district, Bagmati zone. UT-1 HEP is financed by International Finance Corporation (IFC) along with other eight international financing institutions namely ADB, AIIB, K-EXIM, KDB, CDC, FMO, PROPARCO and OFID. The power generated from this project is expected to be interconnected into the national grid through Trishuli 3B Hub station.

Client
Nepal Water and Energy Development
Company Pvt. Ltd.

Scope of works
– Feasibility Study
– IEE Study
– Detailed Design
– Owner’s Engineer

Location 
Rasuwa district Haku, Gogane and VDCs
Nearest highway: Pasang Lahmu Highway