Budhigandaki HPP

(1200MW)

SASEC (South Asia Sub-regional Economic Cooperation) Power System Expansion Project

The transmission line under this project, are going to strengthen the INPS (Integrated Nepal Power System) in the areas of Marsyangdi, Kaligandaki and Trishuli River Basins, & the distribution system expansion projects under this project are going to strengthen the distribution system network all over the nation. Jade Consult is working in association with POWERGRID Corporation of India Ltd. in this project.

Client
Asian Development Bank

Implementing Agency
Nepal Electricity Authority (NEA)

Scope of works
(In association with
POWERGRID India)
– Assist NEA in preparing designs,
   technical specifications and bidding documents
– Assist NEA in the bidding process and bid evaluation
   including preparation of technical and financial
   evaluation reports
– Assist NEA in contract negotiation with the contractor
   until contract awarded and advance payment paid

Project Features
Dana – Kusma 220kV  TL (40 km length),
and substations at Dana & Kusma

Kusma – New Butwal 220kV  TL (88 km length),
and substation at New Butwal

New Butwal – Bardaghat 400kV  TL (45 km length),
and LILO of 132kV Double Circuit Butwal- Bardaghat Transmission Line at New Butwal Substation.

Markichowk- Matatirtha 220kV TL (82 km length),
and associated substation at Markichowk extension at Matatirtha.

New Bharatpur- Markichowk- Udipur 220kV TL (64 km length),
and substation at Udipur, bay extension at New Bharatpur
and Markichowk

Udipur -Khudi-Manang 220kV TL (50 km length),
and associated substations at Manang and bay extension at Udipur