Karmadev (Indo-Nepal Border) – Phukot (Kalikot) 400 kV Double Circuit Karnali Corridor Transmission Line
Client
Rastriya Prasaran Grid Company Limited (RPGCL)
Scope of Works
- Detailed Engineering and Environmental Study which includes
- Detail route alignment survey of transmission lines, including walkover survey and field reconnaissance survey
- Profiling, contouring and tower Spotting of the transmission lines using PLS-CADD, and verification and demarcation of the tower spots in the site
- Identification of land plot and tree counting
- Geotechnical exploration including electrical resistivity test (ERT) at tower locations and substations
- Detailed tower design and foundation design.
- Electrical design of transmission line including selection of conductor, shield wires, OPGW, insulators and all other line accessories.
- Detailed Engineering design of substations
- Initial Environmental Examination (IEE) studies, including Environmental and Social safeguard studies
- Detail tree cutting plan with marking in the tree and ROW details of the transmission lines.
- Preparation of Construction Plan, Bidding Documents & Cost Estimates, Economic/Financial Analysis
Involvement (JV/Single):
- In association with POWERGRID India
Project Features
- 400 kV Double Circuit New karmadev (Indo – Nepal Border) – Dododhara (New Lamki) – Betan (Surkhet) – Phukot (Kalikot) Transmission Line (Length is about 130 km)
- Associated Substations at Phukot and Betan