Chilime – Trishuli 220 kv Transmission Line Project
Client
Nepal Electricity Authority (NEA), Nepal, represented by KfW, Germany
Scope of Works (In association with POWERGRID India)
- Survey, Geotechnical Investigation
- Preparation of technical specifications and bidding documents
- Support in Bidding process
- Supervision during construction, testing and commissioning
Project Features
- Chilime – Trishuli 220 kV Double Circuit Transmission Line (26.5 Km length)
- Number of Substation : 2 (220 kV Chilime Hub Substation and 220 kV Trishuli 3B Hub Substation)
- Rural Electrification (Neighborhood Support Program)
- 33/11 kV Substation at Dhunche VDC and/ or Kaule VDC
- 33 kV Line and 11 kV Distribution lines